Annual report pursuant to Section 13 and 15(d)

Organization and Nature of Operations

v3.20.4
Organization and Nature of Operations
12 Months Ended
Dec. 31, 2020
Organization, Consolidation and Presentation of Financial Statements [Abstract]  
Organization and Nature of Operations ORGANIZATION AND NATURE OF OPERATIONS
Cheniere, a Delaware corporation, is a Houston-based energy infrastructure company primarily engaged in LNG-related businesses. We are operating and constructing two natural gas liquefaction and export facilities at Sabine Pass and Corpus Christi.

The Sabine Pass LNG terminal is located in Cameron Parish, Louisiana, on the Sabine-Neches Waterway less than four miles from the Gulf Coast. Cheniere Partners, through its subsidiary SPL, is currently operating five natural gas liquefaction Trains and is constructing one additional Train that is expected to be substantially completed in the second half of 2022, for a total production capacity of approximately 30 mtpa of LNG (the “SPL Project”) at the Sabine Pass LNG terminal. The Sabine Pass LNG terminal has operational regasification facilities owned by Cheniere Partners’ subsidiary, SPLNG, that include pre-existing infrastructure of five LNG storage tanks, two marine berths and vaporizers and an additional marine berth that is under construction. Cheniere Partners also owns a 94-mile pipeline that interconnects the Sabine Pass LNG terminal with a number of large interstate pipelines (the “Creole Trail Pipeline”) through its subsidiary, CTPL. As of December 31, 2020, we owned 100% of the general partner interest and 48.6% of the limited partner interest in Cheniere Partners.

The Corpus Christi LNG terminal is located near Corpus Christi, Texas and is operated and constructed by our subsidiary, CCL. We are currently operating two Trains and one additional Train is undergoing commissioning for a total production capacity of approximately 15 mtpa of LNG. We also operate a 23-mile natural gas supply pipeline that interconnects the Corpus Christi LNG terminal with several interstate and intrastate natural gas pipelines (the “Corpus Christi Pipeline” and together with the Trains, the “CCL Project”) through our subsidiary, CCP. The CCL Project, once fully constructed, will contain three LNG storage tanks and two marine berths.

Additionally, separate from the CCH Group, we are developing an expansion of the Corpus Christi LNG terminal adjacent to the CCL Project (“Corpus Christi Stage 3”) through our subsidiary CCL Stage III, for up to seven midscale Trains with an expected total production capacity of approximately 10 mtpa of LNG. We received approval from FERC in November 2019 to site, construct and operate the expansion project.

We remain focused on operational excellence and customer satisfaction. Increasing demand of LNG has allowed us to expand our liquefaction infrastructure in a financially disciplined manner. We have increased available liquefaction capacity at our Liquefaction Projects as a result of debottlenecking and other optimization projects. We hold significant land positions at both the Sabine Pass LNG terminal and the Corpus Christi LNG terminal which provide opportunity for further liquefaction capacity expansion. The development of these sites or other projects, including infrastructure projects in support of natural gas supply and LNG demand, will require, among other things, acceptable commercial and financing arrangements before we make a final investment decision (“FID”).