false--12-31FY20190000003570P6M0.0580.7182.130.86P19YP3MP5DP5DP3M750000000P3DP3DP3DP3YP3Y0.03P3YP2YP4YP3YP4Y0000.0030.003480000000480000000269800000270700000257000000253600000000.011250.021250.01500.02500.00750.01750.00250.01250.00250.01250.00750.01750.00750.01750194000000LIBOR or base rateLIBOR or base rateLIBOR or base rateLIBOR or base rateLIBOR or base rate0.0940.048750.04250.056250.06250.056250.0700000.05750.052500.058750.056250.056250.058750.051250.05000.0420.0450.0370.050.039250.04800P15Y12500000002800000000.01500000000.012500000001200000000.01200000000.01130000005500000000.00010.00015000000500000000P50YP30YP7YP10YP2YP1Y001280000017100000 0000003570 2019-01-01 2019-12-31 0000003570 us-gaap:InterestRateContractMember 2019-01-01 2019-12-31 0000003570 us-gaap:ForeignExchangeContractMember 2019-01-01 2019-12-31 0000003570 us-gaap:CommodityContractMember 2019-01-01 2019-12-31 0000003570 2019-06-28 0000003570 2020-02-19 0000003570 2018-12-31 0000003570 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember 2019-12-31 0000003570 lng:RegasificationServiceMember 2019-01-01 2019-12-31 0000003570 2018-01-01 2018-12-31 0000003570 2017-01-01 2017-12-31 0000003570 lng:RegasificationServiceMember 2018-01-01 2018-12-31 0000003570 lng:RegasificationServiceMember 2017-01-01 2017-12-31 0000003570 us-gaap:ProductAndServiceOtherMember 2017-01-01 2017-12-31 0000003570 us-gaap:ProductAndServiceOtherMember 2019-01-01 2019-12-31 0000003570 lng:LiquefiedNaturalGasMember 2019-01-01 2019-12-31 0000003570 us-gaap:ProductAndServiceOtherMember 2018-01-01 2018-12-31 0000003570 lng:LiquefiedNaturalGasMember 2017-01-01 2017-12-31 0000003570 lng:LiquefiedNaturalGasMember 2018-01-01 2018-12-31 0000003570 us-gaap:CommonStockMember 2018-01-01 2018-12-31 0000003570 us-gaap:CommonStockMember 2019-01-01 2019-12-31 0000003570 us-gaap:NoncontrollingInterestMember 2019-01-01 2019-12-31 0000003570 us-gaap:TreasuryStockMember 2017-01-01 2017-12-31 0000003570 us-gaap:RetainedEarningsMember 2018-01-01 2018-12-31 0000003570 us-gaap:RetainedEarningsMember 2019-01-01 2019-12-31 0000003570 us-gaap:CommonStockMember 2017-01-01 2017-12-31 0000003570 us-gaap:TreasuryStockMember 2019-01-01 2019-12-31 0000003570 us-gaap:AdditionalPaidInCapitalMember 2018-01-01 2018-12-31 0000003570 us-gaap:TreasuryStockMember 2018-01-01 2018-12-31 0000003570 us-gaap:AdditionalPaidInCapitalMember 2016-12-31 0000003570 us-gaap:AdditionalPaidInCapitalMember 2019-12-31 0000003570 us-gaap:NoncontrollingInterestMember 2017-01-01 2017-12-31 0000003570 us-gaap:AdditionalPaidInCapitalMember 2019-01-01 2019-12-31 0000003570 us-gaap:RetainedEarningsMember 2017-01-01 2017-12-31 0000003570 us-gaap:TreasuryStockMember 2019-12-31 0000003570 us-gaap:RetainedEarningsMember 2019-12-31 0000003570 us-gaap:NoncontrollingInterestMember 2018-01-01 2018-12-31 0000003570 2017-12-31 0000003570 us-gaap:CommonStockMember 2019-12-31 0000003570 us-gaap:CommonStockMember 2017-12-31 0000003570 us-gaap:AdditionalPaidInCapitalMember 2018-12-31 0000003570 us-gaap:RetainedEarningsMember 2016-12-31 0000003570 us-gaap:AdditionalPaidInCapitalMember 2017-01-01 2017-12-31 0000003570 us-gaap:NoncontrollingInterestMember 2019-12-31 0000003570 us-gaap:NoncontrollingInterestMember 2017-12-31 0000003570 us-gaap:CommonStockMember 2016-12-31 0000003570 2016-12-31 0000003570 us-gaap:RetainedEarningsMember 2018-12-31 0000003570 us-gaap:CommonStockMember 2018-12-31 0000003570 us-gaap:NoncontrollingInterestMember 2018-12-31 0000003570 us-gaap:TreasuryStockMember 2017-12-31 0000003570 us-gaap:RetainedEarningsMember 2017-12-31 0000003570 us-gaap:TreasuryStockMember 2016-12-31 0000003570 us-gaap:TreasuryStockMember 2018-12-31 0000003570 us-gaap:NoncontrollingInterestMember 2016-12-31 0000003570 us-gaap:AdditionalPaidInCapitalMember 2017-12-31 0000003570 lng:SabinePassLNGTerminalMember 2019-01-01 2019-12-31 0000003570 lng:CorpusChristiLNGTerminalMember 2019-01-01 2019-12-31 0000003570 lng:CorpusChristiLNGTerminalExpansionMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:SabinePassLNGTerminalMember 2019-12-31 2019-12-31 0000003570 lng:CorpusChristiLNGTerminalMember 2019-12-31 2019-12-31 0000003570 srt:MaximumMember lng:CorpusChristiLNGTerminalExpansionMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:CreoleTrailPipelineMember 2019-01-01 2019-12-31 0000003570 lng:CorpusChristiPipelineMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionMember lng:SPACustomersMember us-gaap:CustomerConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 lng:AssetsUsedInNoncoreOperationsMember 2017-01-01 2017-12-31 0000003570 srt:MaximumMember lng:SabinePassLNGTerminalMember 2019-12-31 0000003570 lng:CreoleTrailPipelineMember 2019-12-31 0000003570 lng:CorpusChristiLiquefactionMember lng:SPACustomersMember us-gaap:CustomerConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLNGLPMember lng:TUACustomersMember us-gaap:CustomerConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 lng:CorpusChristiLNGTerminalMember 2017-01-01 2017-12-31 0000003570 lng:SabinePassLNGTerminalMember 2019-12-31 0000003570 us-gaap:AccountingStandardsUpdate201602Member 2019-01-01 0000003570 lng:CorpusChristiPipelineMember 2019-12-31 0000003570 lng:A2016CQPCreditFacilitiesMember 2018-12-31 0000003570 lng:CCLProjectMember 2019-12-31 0000003570 lng:CCLProjectMember 2018-12-31 0000003570 lng:CQPAndCashHeldByGuarantorSubsidiariesMember 2019-12-31 0000003570 lng:SPLProjectMember 2019-12-31 0000003570 lng:SubsidiaryCashMember 2019-12-31 0000003570 lng:CQPAndCashHeldByGuarantorSubsidiariesMember 2018-12-31 0000003570 lng:SPLProjectMember 2018-12-31 0000003570 lng:SubsidiaryCashMember 2018-12-31 0000003570 lng:SabinePassLiquefactionAndCorpusChristiLiquefactionMember 2018-12-31 0000003570 lng:CheniereMarketingLLCMember 2019-12-31 0000003570 lng:CheniereMarketingLLCMember 2018-12-31 0000003570 lng:SabinePassLiquefactionAndCorpusChristiLiquefactionMember 2019-12-31 0000003570 lng:LiquefiedNaturalGasInventoryMember 2019-12-31 0000003570 lng:LiquefiedNaturalGasInTransitInventoryMember 2019-12-31 0000003570 lng:LiquefiedNaturalGasInTransitInventoryMember 2018-12-31 0000003570 lng:LiquefiedNaturalGasInventoryMember 2018-12-31 0000003570 lng:NaturalGasInventoryMember 2019-12-31 0000003570 lng:MaterialsAndOtherInventoryMember 2018-12-31 0000003570 lng:NaturalGasInventoryMember 2018-12-31 0000003570 lng:MaterialsAndOtherInventoryMember 2019-12-31 0000003570 lng:MarineBerthElectricalFacilityAndRoadsMember 2019-01-01 2019-12-31 0000003570 lng:WaterPipelinesMember 2019-01-01 2019-12-31 0000003570 lng:RegasificationProcessingEquipmentRecondensersVaporizationAndVentsMember 2019-01-01 2019-12-31 0000003570 lng:LNGStorageTanksMember 2019-01-01 2019-12-31 0000003570 us-gaap:PipelinesMember 2019-01-01 2019-12-31 0000003570 lng:SendoutPumpsMember 2019-01-01 2019-12-31 0000003570 us-gaap:OtherCapitalizedPropertyPlantAndEquipmentMember 2018-12-31 0000003570 us-gaap:OtherCapitalizedPropertyPlantAndEquipmentMember 2019-12-31 0000003570 lng:LngTerminalCostsMember 2019-12-31 0000003570 lng:LngTerminalMember 2018-12-31 0000003570 us-gaap:LandMember 2019-12-31 0000003570 us-gaap:SoftwareAndSoftwareDevelopmentCostsMember 2018-12-31 0000003570 lng:LngSiteAndRelatedCostsNetMember 2019-12-31 0000003570 us-gaap:LandMember 2018-12-31 0000003570 us-gaap:AssetsHeldUnderCapitalLeasesMember 2019-12-31 0000003570 us-gaap:LeaseholdImprovementsMember 2019-12-31 0000003570 us-gaap:ConstructionInProgressMember 2019-12-31 0000003570 us-gaap:LeaseholdImprovementsMember 2018-12-31 0000003570 lng:FixedAssetsMember 2018-12-31 0000003570 lng:LngTerminalMember 2019-12-31 0000003570 us-gaap:SoftwareAndSoftwareDevelopmentCostsMember 2019-12-31 0000003570 lng:LngTerminalCostsMember 2018-12-31 0000003570 us-gaap:AssetsHeldUnderCapitalLeasesMember 2018-12-31 0000003570 us-gaap:ConstructionInProgressMember 2018-12-31 0000003570 lng:FixedAssetsMember 2019-12-31 0000003570 us-gaap:FurnitureAndFixturesMember 2018-12-31 0000003570 us-gaap:OfficeEquipmentMember 2019-12-31 0000003570 us-gaap:FurnitureAndFixturesMember 2019-12-31 0000003570 lng:LngSiteAndRelatedCostsNetMember 2018-12-31 0000003570 us-gaap:OfficeEquipmentMember 2018-12-31 0000003570 srt:MaximumMember lng:LngTerminalCostsMember 2019-01-01 2019-12-31 0000003570 srt:MinimumMember lng:LngTerminalCostsMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember lng:LiquefactionProcessingEquipmentMember 2019-01-01 2019-12-31 0000003570 srt:MinimumMember lng:LiquefactionProcessingEquipmentMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember us-gaap:OtherEnergyEquipmentMember 2019-01-01 2019-12-31 0000003570 srt:MinimumMember us-gaap:OtherEnergyEquipmentMember 2019-01-01 2019-12-31 0000003570 lng:CQPInterestRateDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2017-01-01 2017-12-31 0000003570 lng:CQPInterestRateDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2018-01-01 2018-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2018-01-01 2018-12-31 0000003570 lng:SPLInterestRateDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2019-01-01 2019-12-31 0000003570 lng:CQPInterestRateDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2019-01-01 2019-12-31 0000003570 lng:CCHInterestRateDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2017-01-01 2017-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2019-01-01 2019-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2017-01-01 2017-12-31 0000003570 lng:SPLInterestRateDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2017-01-01 2017-12-31 0000003570 lng:CCHInterestRateDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2019-01-01 2019-12-31 0000003570 lng:CCHInterestRateDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2018-01-01 2018-12-31 0000003570 lng:SPLInterestRateDerivativesMember us-gaap:GainLossOnDerivativeInstrumentsMember 2018-01-01 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember us-gaap:ForeignExchangeContractMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember us-gaap:ForeignExchangeContractMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember us-gaap:ForeignExchangeContractMember 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember us-gaap:ForeignExchangeContractMember 2018-12-31 0000003570 lng:PhysicalLiquefactionSupplyDerivativesMember us-gaap:FairValueInputsLevel3Member 2019-12-31 0000003570 lng:PhysicalLiquefactionSupplyDerivativesMember 2018-12-31 0000003570 lng:PhysicalLiquefactionSupplyDerivativesMember 2017-01-01 2017-12-31 0000003570 lng:PhysicalLiquefactionSupplyDerivativesMember 2019-01-01 2019-12-31 0000003570 lng:PhysicalLiquefactionSupplyDerivativesMember 2018-01-01 2018-12-31 0000003570 lng:PhysicalLiquefactionSupplyDerivativesMember 2017-12-31 0000003570 lng:PhysicalLiquefactionSupplyDerivativesMember 2019-12-31 0000003570 lng:PhysicalLiquefactionSupplyDerivativesMember 2016-12-31 0000003570 lng:LNGTradingDerivativeMember 2019-12-31 0000003570 lng:CorpusChristiLiquefactionMember lng:NaturalGasSupplyAgreementMember 2018-01-01 2018-12-31 0000003570 lng:CorpusChristiLiquefactionMember lng:NaturalGasSupplyAgreementMember 2019-12-31 0000003570 us-gaap:PriceRiskDerivativeMember 2018-12-31 0000003570 lng:A2015CCHTermLoanFacilityMember 2019-11-01 2019-11-30 0000003570 lng:CorpusChristiLiquefactionMember lng:NaturalGasSupplyAgreementMember 2018-12-31 0000003570 lng:CorpusChristiLiquefactionMember lng:NaturalGasSupplyAgreementMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember lng:PhysicalLiquefactionSupplyDerivativesMember 2019-01-01 2019-12-31 0000003570 us-gaap:PriceRiskDerivativeMember 2019-12-31 0000003570 lng:LNGTradingDerivativeMember 2018-12-31 0000003570 us-gaap:ForeignExchangeContractMember 2019-12-31 0000003570 us-gaap:PriceRiskDerivativeMember lng:NaturalGasSupplyAgreementMember 2019-01-01 2019-12-31 0000003570 us-gaap:ForeignExchangeContractMember 2018-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:CostOfSalesMember 2018-01-01 2018-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:SalesMember 2019-01-01 2019-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:CostOfSalesMember 2017-01-01 2017-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:SalesMember 2017-01-01 2017-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:SalesMember 2018-01-01 2018-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:CostOfSalesMember 2019-01-01 2019-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:SalesMember 2019-01-01 2019-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:CostOfSalesMember 2019-01-01 2019-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:CostOfSalesMember 2017-01-01 2017-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:SalesMember 2017-01-01 2017-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:SalesMember 2018-01-01 2018-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:CostOfSalesMember 2018-01-01 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember us-gaap:PriceRiskDerivativeMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember us-gaap:CommodityContractMember 2018-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember lng:LNGTradingDerivativeMember 2018-12-31 0000003570 us-gaap:CommodityContractMember 2019-12-31 0000003570 us-gaap:CommodityContractMember 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember lng:LNGTradingDerivativeMember 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember us-gaap:PriceRiskDerivativeMember 2019-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember us-gaap:CommodityContractMember 2018-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember us-gaap:PriceRiskDerivativeMember 2018-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember us-gaap:PriceRiskDerivativeMember 2018-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember us-gaap:CommodityContractMember 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember us-gaap:CommodityContractMember 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember lng:LNGTradingDerivativeMember 2018-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember us-gaap:CommodityContractMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember lng:LNGTradingDerivativeMember 2019-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember us-gaap:PriceRiskDerivativeMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember lng:LNGTradingDerivativeMember 2019-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember us-gaap:PriceRiskDerivativeMember 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember 2019-01-01 2019-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember us-gaap:CommodityContractMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember us-gaap:CommodityContractMember 2019-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember lng:LNGTradingDerivativeMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember us-gaap:PriceRiskDerivativeMember 2018-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember lng:LNGTradingDerivativeMember 2018-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember lng:LNGTradingDerivativeMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember us-gaap:CommodityContractMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember us-gaap:PriceRiskDerivativeMember 2018-12-31 0000003570 lng:PriceRiskDerivativeAssetMember 2018-12-31 0000003570 lng:ForeignExchangeContractAssetMember 2019-12-31 0000003570 lng:PriceRiskDerivativeLiabilityMember 2019-12-31 0000003570 lng:CCHInterestRateDerivativeLiabilityMember 2019-12-31 0000003570 lng:ForeignExchangeContractLiabilityMember 2019-12-31 0000003570 lng:ForeignExchangeContractLiabilityMember 2018-12-31 0000003570 lng:LNGTradingDerivativesLiabilityMember 2019-12-31 0000003570 lng:LNGTradingDerivativeAssetMember 2018-12-31 0000003570 lng:CCHInterestRateDerivativeAssetMember 2018-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember 2019-12-31 0000003570 lng:LNGTradingDerivativesLiabilityMember 2018-12-31 0000003570 lng:PriceRiskDerivativeLiabilityMember 2018-12-31 0000003570 lng:PriceRiskDerivativeAssetMember 2019-12-31 0000003570 lng:ForeignExchangeContractAssetMember 2018-12-31 0000003570 lng:LNGTradingDerivativeAssetMember 2019-12-31 0000003570 lng:CCHInterestRateDerivativesMember 2019-12-31 0000003570 lng:CCHInterestRateDerivativesMember 2019-01-01 2019-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember 2018-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember 2019-01-01 2019-12-31 0000003570 lng:CCHInterestRateDerivativesMember 2018-12-31 0000003570 us-gaap:ForeignExchangeContractMember us-gaap:SalesMember 2019-01-01 2019-12-31 0000003570 us-gaap:ForeignExchangeContractMember us-gaap:SalesMember 2017-01-01 2017-12-31 0000003570 us-gaap:ForeignExchangeContractMember us-gaap:SalesMember 2018-01-01 2018-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:FairValueInputsLevel1Member 2018-12-31 0000003570 lng:CCHInterestRateDerivativesMember us-gaap:FairValueInputsLevel2Member 2018-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:FairValueInputsLevel3Member 2019-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember us-gaap:FairValueInputsLevel3Member 2018-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:FairValueInputsLevel3Member 2019-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:FairValueInputsLevel1Member 2019-12-31 0000003570 lng:CCHInterestRateDerivativesMember us-gaap:FairValueInputsLevel1Member 2019-12-31 0000003570 lng:CCHInterestRateDerivativesMember us-gaap:FairValueInputsLevel3Member 2019-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember us-gaap:FairValueInputsLevel1Member 2019-12-31 0000003570 lng:CCHInterestRateDerivativesMember us-gaap:FairValueInputsLevel1Member 2018-12-31 0000003570 us-gaap:ForeignExchangeContractMember us-gaap:FairValueInputsLevel3Member 2019-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember us-gaap:FairValueInputsLevel3Member 2019-12-31 0000003570 us-gaap:ForeignExchangeContractMember us-gaap:FairValueInputsLevel2Member 2019-12-31 0000003570 lng:CCHInterestRateDerivativesMember us-gaap:FairValueInputsLevel3Member 2018-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:FairValueInputsLevel2Member 2019-12-31 0000003570 us-gaap:ForeignExchangeContractMember us-gaap:FairValueInputsLevel1Member 2018-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:FairValueInputsLevel2Member 2019-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember us-gaap:FairValueInputsLevel2Member 2018-12-31 0000003570 us-gaap:ForeignExchangeContractMember us-gaap:FairValueInputsLevel1Member 2019-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:FairValueInputsLevel3Member 2018-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember us-gaap:FairValueInputsLevel2Member 2019-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:FairValueInputsLevel2Member 2018-12-31 0000003570 lng:CCHInterestRateDerivativesMember us-gaap:FairValueInputsLevel2Member 2019-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:FairValueInputsLevel1Member 2018-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:FairValueInputsLevel1Member 2019-12-31 0000003570 lng:LNGTradingDerivativeMember us-gaap:FairValueInputsLevel3Member 2018-12-31 0000003570 us-gaap:PriceRiskDerivativeMember us-gaap:FairValueInputsLevel2Member 2018-12-31 0000003570 us-gaap:ForeignExchangeContractMember us-gaap:FairValueInputsLevel2Member 2018-12-31 0000003570 lng:CCHInterestRateForwardStartDerivativesMember us-gaap:FairValueInputsLevel1Member 2018-12-31 0000003570 us-gaap:ForeignExchangeContractMember us-gaap:FairValueInputsLevel3Member 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember lng:CCHInterestRateForwardStartDerivativesMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember lng:CCHInterestRateDerivativesMember 2018-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember lng:CCHInterestRateDerivativesMember 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember lng:CCHInterestRateDerivativesMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember us-gaap:InterestRateContractMember 2018-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember lng:CCHInterestRateDerivativesMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember us-gaap:InterestRateContractMember 2018-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember lng:CCHInterestRateDerivativesMember 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember lng:CCHInterestRateForwardStartDerivativesMember 2018-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember us-gaap:InterestRateContractMember 2019-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember lng:CCHInterestRateForwardStartDerivativesMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember lng:CCHInterestRateForwardStartDerivativesMember 2019-12-31 0000003570 us-gaap:InterestRateContractMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember lng:CCHInterestRateDerivativesMember 2018-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember lng:CCHInterestRateForwardStartDerivativesMember 2018-12-31 0000003570 us-gaap:InterestRateContractMember 2018-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember us-gaap:InterestRateContractMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember lng:CCHInterestRateDerivativesMember 2019-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember us-gaap:InterestRateContractMember 2019-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember lng:CCHInterestRateForwardStartDerivativesMember 2019-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember lng:CCHInterestRateForwardStartDerivativesMember 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsAssetsMember lng:CCHInterestRateForwardStartDerivativesMember 2018-12-31 0000003570 us-gaap:DerivativeFinancialInstrumentsLiabilitiesMember us-gaap:InterestRateContractMember 2019-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember lng:CCHInterestRateDerivativesMember 2019-12-31 0000003570 lng:NoncurrentDerivativeAssetsMember us-gaap:InterestRateContractMember 2018-12-31 0000003570 lng:NoncurrentDerivativeLiabilitiesMember us-gaap:InterestRateContractMember 2018-12-31 0000003570 srt:MinimumMember lng:PhysicalLiquefactionSupplyDerivativesMember us-gaap:FairValueInputsLevel3Member us-gaap:ValuationTechniqueOptionPricingModelMember 2019-01-01 2019-12-31 0000003570 srt:MinimumMember lng:PhysicalLiquefactionSupplyDerivativesMember us-gaap:FairValueInputsLevel3Member us-gaap:MarketApproachValuationTechniqueMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember lng:PhysicalLiquefactionSupplyDerivativesMember us-gaap:FairValueInputsLevel3Member us-gaap:ValuationTechniqueOptionPricingModelMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember lng:PhysicalLiquefactionSupplyDerivativesMember us-gaap:FairValueInputsLevel3Member us-gaap:MarketApproachValuationTechniqueMember 2019-01-01 2019-12-31 0000003570 lng:CorpusChristiLiquefactionMember lng:NaturalGasSupplyAgreementMember 2018-10-01 2018-12-31 0000003570 lng:CorpusChristiLiquefactionMember lng:NaturalGasSupplyAgreementMember 2017-01-01 2017-12-31 0000003570 lng:CheniereLNGOMServicesLLCMember us-gaap:ServiceAgreementsMember lng:MidshipPipelineMember 2019-12-31 0000003570 lng:CheniereLNGOMServicesLLCMember us-gaap:ServiceAgreementsMember lng:MidshipPipelineMember 2018-12-31 0000003570 lng:CheniereLNGOMServicesLLCMember us-gaap:ServiceAgreementsMember lng:MidshipPipelineMember 2019-01-01 2019-12-31 0000003570 lng:CorpusChristiLiquefactionMember lng:NaturalGasTransportationAgreementMember lng:MidshipPipelineMember 2019-01-01 2019-12-31 0000003570 lng:MidshipHoldingsLLCMember 2018-12-31 0000003570 lng:CheniereLNGOMServicesLLCMember us-gaap:ServiceAgreementsMember lng:MidshipPipelineMember 2018-01-01 2018-12-31 0000003570 lng:MidshipPipelineMember 2019-01-01 2019-12-31 0000003570 lng:EIGGlobalEnergyPartnersMember srt:MaximumMember 2019-12-31 0000003570 lng:MidshipPipelineMember lng:MidshipPipelineLetterofCreditMember lng:CorpusChristiLiquefactionMember 2018-05-31 0000003570 lng:MidshipPipelineMember lng:MidshipPipelineLetterofCreditMember lng:CorpusChristiLiquefactionMember 2019-12-31 0000003570 lng:MidshipHoldingsLLCMember 2019-12-31 0000003570 lng:CheniereLNGOMServicesLLCMember us-gaap:ServiceAgreementsMember lng:MidshipPipelineMember 2017-01-01 2017-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:CommonUnitsMember 2019-12-31 0000003570 lng:CheniereEnergyPartnersGPLLCMember lng:BlackstoneCqpHoldcoLpMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersGPLLCMember lng:BlackstoneCQPHoldcoLPAndCheniereEnergyIncMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:ClassBUnitsMember lng:BlackstoneCqpHoldcoLpMember 2012-01-01 2012-12-31 0000003570 lng:CheniereEnergyPartnersGPLLCMember lng:CheniereEnergyIncMember 2019-01-01 2019-12-31 0000003570 lng:BlackstoneCqpHoldcoLpMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:SubordinatedUnitsMember 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:DirectorAppointmentEntitlementMinimumMember lng:BlackstoneCqpHoldcoLpMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember 2018-12-31 0000003570 lng:A2045ConvertibleSeniorNotesMember 2019-12-31 0000003570 lng:A2025ConvertibleSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:A2021ConvertibleUnsecuredNotesMember 2019-12-31 0000003570 lng:A2025ConvertibleSeniorNotesMember 2019-12-31 0000003570 lng:A2045ConvertibleSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:A2021ConvertibleUnsecuredNotesMember 2019-01-01 2019-12-31 0000003570 lng:A2026SabinePassLiquefactionSeniorNotesMember 2019-12-31 0000003570 lng:A2037SabinePassLiquefactionNotesMember 2019-12-31 0000003570 lng:A2037SabinePassLiquefactionNotesMember 2018-12-31 0000003570 lng:WorkingCapitalFacilityMember 2019-12-31 0000003570 lng:A2027CorpusChristiHoldingsSeniorNotesMember 2019-12-31 0000003570 lng:A2016CQPCreditFacilitiesMember 2018-12-31 0000003570 lng:A2019CQPCreditFacilitiesMember 2019-12-31 0000003570 lng:A2025CorpusChristiHoldingsSeniorNotesMember 2018-12-31 0000003570 lng:A2024CorpusChristiHoldingsSeniorNotesMember 2018-12-31 0000003570 lng:A2027SabinePassLiquefactionSeniorNotesMember 2018-12-31 0000003570 lng:A2026SabinePassLiquefactionSeniorNotesMember 2018-12-31 0000003570 lng:A2025SabinePassLiquefactionSeniorNotesMember 2018-12-31 0000003570 lng:A2028SabinePassLiquefactionSeniorNotesMember 2018-12-31 0000003570 lng:WorkingCapitalFacilityMember 2018-12-31 0000003570 lng:CorpusChristiHoldingsWorkingCapitalFacilityMember 2019-12-31 0000003570 lng:A2021SabinePassLiquefactionSeniorNotesMember 2019-12-31 0000003570 lng:A2028SabinePassLiquefactionSeniorNotesMember 2019-12-31 0000003570 lng:A2025SabinePassLiquefactionSeniorNotesMember 2019-12-31 0000003570 lng:A2039CorpusChristiHoldingsSeniorNotesMember 2018-12-31 0000003570 lng:A2015CCHTermLoanFacilityMember 2019-12-31 0000003570 lng:A2021ConvertibleUnsecuredNotesMember 2018-12-31 0000003570 lng:A2025CheniereEnergyPartnersSeniorNotesMember 2019-12-31 0000003570 lng:A2026CheniereEnergyPartnersSeniorNotesMember 2018-12-31 0000003570 lng:A2025CorpusChristiHoldingsSeniorNotesMember 2019-12-31 0000003570 lng:CheniereRevolvingCreditFacilityMember 2019-12-31 0000003570 lng:A2029CheniereEnergyPartnersSeniorNotesMember 2018-12-31 0000003570 lng:A2025ConvertibleSeniorNotesMember 2018-12-31 0000003570 lng:CorpusChristiHoldingsWorkingCapitalFacilityMember 2018-12-31 0000003570 lng:A2027SabinePassLiquefactionSeniorNotesMember 2019-12-31 0000003570 lng:CheniereMarketingTradeFinanceFacilitiesMember 2018-12-31 0000003570 lng:A2029CheniereEnergyPartnersSeniorNotesMember 2019-12-31 0000003570 lng:A2016CQPCreditFacilitiesMember 2019-12-31 0000003570 lng:A2027CorpusChristiHoldingsSeniorNotesMember 2018-12-31 0000003570 lng:A2021SabinePassLiquefactionSeniorNotesMember 2018-12-31 0000003570 lng:A2026CheniereEnergyPartnersSeniorNotesMember 2019-12-31 0000003570 lng:A2022SabinePassLiquefactionSeniorNotesMember 2019-12-31 0000003570 lng:A2019CQPCreditFacilitiesMember 2018-12-31 0000003570 lng:CheniereMarketingTradeFinanceFacilitiesMember 2019-12-31 0000003570 lng:A2024SabinePassLiquefactionSeniorNotesMember 2018-12-31 0000003570 lng:A2024SabinePassLiquefactionSeniorNotesMember 2019-12-31 0000003570 lng:A2023SabinePassLiquefactionSeniorNotesMember 2019-12-31 0000003570 lng:A2022SabinePassLiquefactionSeniorNotesMember 2018-12-31 0000003570 lng:A2015CCHTermLoanFacilityMember 2018-12-31 0000003570 lng:A2025CheniereEnergyPartnersSeniorNotesMember 2018-12-31 0000003570 lng:A2039CorpusChristiHoldingsSeniorNotesMember 2019-12-31 0000003570 lng:A20393.925CorpusChristiHoldingsSeniorNotesMember 2019-12-31 0000003570 lng:A20393.925CorpusChristiHoldingsSeniorNotesMember 2018-12-31 0000003570 lng:A2045ConvertibleSeniorNotesMember 2018-12-31 0000003570 lng:A2029CorpusChristiHoldingsSeniorNotesMember 2019-12-31 0000003570 lng:A2029CorpusChristiHoldingsSeniorNotesMember 2018-12-31 0000003570 lng:CheniereRevolvingCreditFacilityMember 2018-12-31 0000003570 lng:A2024CorpusChristiHoldingsSeniorNotesMember 2019-12-31 0000003570 lng:A2023SabinePassLiquefactionSeniorNotesMember 2018-12-31 0000003570 us-gaap:ConvertibleDebtMember 2017-01-01 2017-12-31 0000003570 us-gaap:ConvertibleDebtMember 2019-01-01 2019-12-31 0000003570 us-gaap:ConvertibleDebtMember 2018-01-01 2018-12-31 0000003570 lng:DebtExcludingCapitalLeaseAndConvertibleDebtMember 2019-01-01 2019-12-31 0000003570 lng:DebtExcludingCapitalLeaseAndConvertibleDebtMember 2017-01-01 2017-12-31 0000003570 lng:DebtExcludingCapitalLeaseAndConvertibleDebtMember 2018-01-01 2018-12-31 0000003570 lng:A20393.925CorpusChristiHoldingsSeniorNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2019-12-31 0000003570 lng:A2021ConvertibleUnsecuredNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2018-12-31 0000003570 lng:A2021ConvertibleUnsecuredNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2018-12-31 0000003570 lng:A2045ConvertibleSeniorNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2018-12-31 0000003570 us-gaap:SeniorNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2018-12-31 0000003570 lng:A2039CorpusChristiHoldingsSeniorNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2018-12-31 0000003570 lng:A2037SabinePassLiquefactionNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2019-12-31 0000003570 us-gaap:SeniorNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2019-12-31 0000003570 lng:A2021ConvertibleUnsecuredNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2019-12-31 0000003570 lng:A2037SabinePassLiquefactionNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2018-12-31 0000003570 lng:A20393.925CorpusChristiHoldingsSeniorNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2018-12-31 0000003570 lng:A20393.925CorpusChristiHoldingsSeniorNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2019-12-31 0000003570 lng:A20393.925CorpusChristiHoldingsSeniorNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2018-12-31 0000003570 us-gaap:LineOfCreditMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2018-12-31 0000003570 us-gaap:LineOfCreditMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2018-12-31 0000003570 lng:A2021ConvertibleUnsecuredNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2019-12-31 0000003570 lng:A2037SabinePassLiquefactionNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2019-12-31 0000003570 us-gaap:SeniorNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2018-12-31 0000003570 us-gaap:SeniorNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2019-12-31 0000003570 lng:A2025ConvertibleSeniorNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2019-12-31 0000003570 lng:A2037SabinePassLiquefactionNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2018-12-31 0000003570 us-gaap:LineOfCreditMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2019-12-31 0000003570 lng:A2025ConvertibleSeniorNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2019-12-31 0000003570 lng:A2039CorpusChristiHoldingsSeniorNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2018-12-31 0000003570 lng:A2045ConvertibleSeniorNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2019-12-31 0000003570 lng:A2039CorpusChristiHoldingsSeniorNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2019-12-31 0000003570 lng:A2025ConvertibleSeniorNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2018-12-31 0000003570 lng:A2045ConvertibleSeniorNotesMember us-gaap:EstimateOfFairValueFairValueDisclosureMember 2018-12-31 0000003570 lng:A2045ConvertibleSeniorNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2019-12-31 0000003570 lng:A2039CorpusChristiHoldingsSeniorNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2019-12-31 0000003570 us-gaap:LineOfCreditMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2019-12-31 0000003570 lng:A2025ConvertibleSeniorNotesMember us-gaap:CarryingReportedAmountFairValueDisclosureMember 2018-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A2015CCHTermLoanFacilityMember 2018-05-01 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:CorpusChristiHoldingsWorkingCapitalFacilityMember 2018-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2029CheniereEnergyPartnersSeniorNotesMember 2019-09-12 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:CorpusChristiHoldingsWorkingCapitalFacilityMember 2019-01-01 2019-12-31 0000003570 lng:DrawnPortionMember lng:CheniereCorpusChristiHoldingsLLCMember lng:CCHLCLoanMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionMember lng:A2026SPLSeniorNotes2027SPLSeniorNotes2028SPLSeniorNotesand2037SPLSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember srt:MaximumMember lng:CorpusChristiHoldingsWorkingCapitalFacilityRevolvingLoansMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:A2021ConvertibleUnsecuredNotesMember 2014-11-30 0000003570 lng:FromandAfterTriggerPointMember lng:CheniereRevolvingCreditFacilityMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember srt:MaximumMember lng:CorpusChristiHoldingsWorkingCapitalFacilityRevolvingLoansMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionMember srt:MaximumMember lng:WorkingCapitalFacilityMember 2019-01-01 2019-12-31 0000003570 lng:BaseRateDeterminationLIBORMember lng:SabinePassLiquefactionMember lng:WorkingCapitalFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:BaseRateDeterminationLIBORMember lng:CheniereEnergyPartnersLPMember lng:A2019CQPCreditFacilitiesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember srt:MinimumMember lng:A2015CCHTermLoanFacilityMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2029CheniereEnergyPartnersSeniorNotesMember 2019-12-31 0000003570 lng:CheniereCCHHoldcoIILLCMember lng:CheniereCCHHoldcoIILLCMember lng:A2025ConvertibleSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionMember lng:SabinePassLiquefactionSeniorNotesExcluding2026SPLSeniorNotes2027SPLSeniorNotes2028SPLSeniorNotesand2037SPLSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember srt:MaximumMember lng:A2019CQPCreditFacilitiesCQPRevolvingFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2019CQPCreditFacilitiesCQPTermFacilityMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:DrawnPortionMember lng:SabinePassLiquefactionMember us-gaap:LetterOfCreditMember 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A2015CCHTermLoanFacilityMember 2019-01-01 2019-12-31 0000003570 lng:BaseRateDeterminationLIBORMember lng:CheniereCorpusChristiHoldingsLLCMember lng:CorpusChristiHoldingsWorkingCapitalFacilityRevolvingLoansMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember lng:CheniereRevolvingCreditFacilityMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:BaseRateDeterminationFederalFundsRateMember lng:CheniereEnergyPartnersLPMember lng:A2019CQPCreditFacilitiesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2029CheniereEnergyPartnersSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2019CQPCreditFacilitiesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember srt:MaximumMember lng:CheniereEnergyPartnersSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionMember lng:WorkingCapitalFacilityMember 2015-09-30 0000003570 lng:CheniereCCHHoldcoIILLCMember lng:A2025ConvertibleSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCCHHoldcoIILLCMember lng:A2025ConvertibleSeniorNotesMember 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember srt:MinimumMember lng:A2019CQPCreditFacilitiesCQPRevolvingFacilityMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember srt:MinimumMember lng:A2015CCHTermLoanFacilityMember 2019-12-31 0000003570 lng:SabinePassLiquefactionMember srt:MaximumMember lng:SwingLineLoanMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:CCHWorkingCapitalLoanMember 2019-01-01 2019-12-31 0000003570 lng:BaseRateDeterminationLIBORMember lng:CheniereRevolvingCreditFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:CorpusChristiHoldingsSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:PortionissuedandnotdrawnMember lng:CheniereCorpusChristiHoldingsLLCMember lng:CCHWorkingCapitalFacilityLetterofCreditMember 2019-01-01 2019-12-31 0000003570 lng:DrawnPortionMember lng:CheniereRevolvingCreditFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 srt:MinimumMember lng:CheniereRevolvingCreditFacilityMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:A2045ConvertibleSeniorNotesMember 2015-03-31 0000003570 lng:CheniereEnergyPartnersLPMember srt:MinimumMember lng:A2019CQPCreditFacilitiesCQPRevolvingFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember srt:WeightedAverageMember lng:A2039CorpusChristiHoldingsSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A2039CorpusChristiHoldingsSeniorNotesMember 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A2015CCHTermLoanFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A2029CorpusChristiHoldingsSeniorNotesMember 2019-11-06 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember srt:MinimumMember lng:CorpusChristiHoldingsWorkingCapitalFacilityRevolvingLoansMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:CheniereEnergyPartnersSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A2015CCHTermLoanFacilityMember 2018-01-01 2018-12-31 0000003570 lng:CheniereRevolvingCreditFacilityMember 2019-01-01 2019-12-31 0000003570 lng:CheniereRevolvingCreditFacilityMember 2018-12-01 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2019CQPCreditFacilitiesCQPTermFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2026CheniereEnergyPartnersSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2019CQPCreditFacilitiesCQPTermFacilityMember 2019-09-12 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A2039CorpusChristiHoldingsSeniorNotesMember 2019-09-27 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A20393.925CorpusChristiHoldingsSeniorNotesMember 2019-10-17 0000003570 lng:NoteHoldersMember lng:A2021ConvertibleUnsecuredNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:CorpusChristiHoldingsWorkingCapitalFacilityMember 2018-06-30 0000003570 srt:MinimumMember lng:CheniereRevolvingCreditFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCCHHoldcoIILLCMember lng:NoteHoldersMember lng:A2025ConvertibleSeniorNotesMember 2019-12-31 0000003570 lng:BaseRateDeterminationFederalFundsRateMember lng:CheniereRevolvingCreditFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:PortionissuedandnotdrawnMember lng:SabinePassLiquefactionMember lng:WorkingCapitalFacilityMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember srt:MinimumMember lng:CorpusChristiHoldingsWorkingCapitalFacilityRevolvingLoansMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionMember lng:SabinePassLiquefactionSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A2029CorpusChristiHoldingsSeniorNotesMember 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2019CQPCreditFacilitiesCQPTermFacilityMember 2019-05-31 0000003570 lng:DrawnPortionMember lng:SabinePassLiquefactionMember us-gaap:LetterOfCreditMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCCHHoldcoIILLCMember lng:NoteHoldersMember lng:A2025ConvertibleSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCCHHoldcoIILLCMember lng:CheniereCCHHoldcoIILLCMember lng:A2025ConvertibleSeniorNotesMember 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A2015CCHTermLoanFacilityMember 2018-05-31 0000003570 lng:BaseRateDeterminationFederalFundsRateMember lng:SabinePassLiquefactionMember lng:WorkingCapitalFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember srt:MaximumMember lng:A2019CQPCreditFacilitiesCQPRevolvingFacilityMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A20393.925CorpusChristiHoldingsSeniorNotesMember 2019-12-31 0000003570 lng:CheniereCCHHoldcoIILLCMember lng:CheniereCCHHoldcoILLCMember lng:A2025ConvertibleSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:PriortoTriggerPointMember lng:CheniereRevolvingCreditFacilityMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCCHHoldcoIILLCMember lng:A2025ConvertibleSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CapitalAllocationFrameworkMember lng:A2015CCHTermLoanFacilityMember 2019-12-31 0000003570 lng:SabinePassLiquefactionMember lng:WorkingCapitalFacilityMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember lng:CheniereRevolvingCreditFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A2015CCHTermLoanFacilityMember 2018-12-31 0000003570 lng:SabinePassLiquefactionMember lng:WorkingCapitalLoanMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionMember lng:WorkingCapitalFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2019CQPCreditFacilitiesCQPRevolvingFacilityMember 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:CorpusChristiHoldingsWorkingCapitalFacilityRevolvingLoansMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionMember srt:MaximumMember lng:LCLoanMember 2019-01-01 2019-12-31 0000003570 lng:NoteHoldersMember lng:A2021ConvertibleUnsecuredNotesMember 2019-12-31 0000003570 lng:BaseRateDeterminationFederalFundsRateMember lng:CheniereCorpusChristiHoldingsLLCMember lng:CorpusChristiHoldingsWorkingCapitalFacilityRevolvingLoansMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2025CheniereEnergyPartnersSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:CheniereEnergyPartnersSeniorNotesMember 2019-12-31 0000003570 lng:SabinePassLiquefactionMember lng:WorkingCapitalFacilityMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:A2015CCHTermLoanFacilityMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember lng:CorpusChristiHoldingsWorkingCapitalFacilityMember 2018-06-01 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2019CQPCreditFacilitiesCQPRevolvingFacilityMember 2019-05-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2029CorpusChristiHoldingsSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember srt:MaximumMember lng:CCHLCLoanMember 2019-01-01 2019-12-31 0000003570 lng:A2015CCHTermLoanFacilityMember 2019-01-01 2019-12-31 0000003570 lng:WorkingCapitalFacilityMember 2019-01-01 2019-12-31 0000003570 lng:A2019CQPCreditFacilitiesMember 2019-01-01 2019-12-31 0000003570 lng:CorpusChristiHoldingsWorkingCapitalFacilityMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember lng:A2019CQPCreditFacilitiesMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:WorkingCapitalFacilityMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember lng:CorpusChristiHoldingsWorkingCapitalFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember lng:CorpusChristiHoldingsWorkingCapitalFacilityMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:A2015CCHTermLoanFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 srt:MinimumMember lng:CorpusChristiHoldingsWorkingCapitalFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 srt:MinimumMember lng:CorpusChristiHoldingsWorkingCapitalFacilityMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 srt:MinimumMember lng:A2019CQPCreditFacilitiesMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:WorkingCapitalFacilityMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 lng:A2015CCHTermLoanFacilityMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 srt:MinimumMember lng:A2019CQPCreditFacilitiesMember us-gaap:BaseRateMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember lng:A2019CQPCreditFacilitiesMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:CheniereCorpusChristiHoldingsLLCMember srt:WeightedAverageMember lng:A20393.925CorpusChristiHoldingsSeniorNotesMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2019CQPCreditFacilitiesMember us-gaap:LondonInterbankOfferedRateLIBORMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionMember lng:SwingLineLoanMember 2019-01-01 2019-12-31 0000003570 lng:CheniereEnergyPartnersLPMember lng:A2019CQPCreditFacilitiesCQPTermFacilityMember 2019-09-30 0000003570 lng:A2019CQPCreditFacilitiesCQPRevolvingFacilityMember 2019-12-31 0000003570 srt:MaximumMember 2019-12-31 0000003570 us-gaap:OperatingExpenseMember 2019-01-01 2019-12-31 0000003570 us-gaap:InterestExpenseMember 2019-01-01 2019-12-31 0000003570 lng:DepreciationandAmortizationExpenseMember 2019-01-01 2019-12-31 0000003570 us-gaap:PropertyPlantAndEquipmentMember 2019-12-31 0000003570 lng:OperatingLeaseAssetsMember 2019-12-31 0000003570 lng:CurrentOperatingLeaseLiabilitiesMember 2019-12-31 0000003570 us-gaap:OtherCurrentLiabilitiesMember 2019-12-31 0000003570 lng:NonCurrentOperatingLeaseLiabilitiesMember 2019-12-31 0000003570 us-gaap:OtherNoncurrentLiabilitiesMember 2019-12-31 0000003570 lng:LiquefiedNaturalGasMember 2019-12-31 0000003570 lng:RegasificationServiceMember 2018-12-31 0000003570 lng:RegasificationServiceMember 2019-12-31 0000003570 lng:LiquefiedNaturalGasMember 2018-12-31 0000003570 lng:EachTUACustomerMember 2019-01-01 2019-12-31 0000003570 lng:TUACustomersMember 2019-01-01 2019-12-31 0000003570 lng:LiquefiedNaturalGasProcuredFromThirdPartiesMemberMember 2019-01-01 2019-12-31 0000003570 lng:TerminalUseAgreementRegasificationCapacityPartialMember 2019-01-01 2019-12-31 0000003570 lng:TerminalUseAgreementRegasificationCapacityPartialMember 2017-01-01 2017-12-31 0000003570 lng:TerminalUseAgreementRegasificationCapacityPartialMember 2018-01-01 2018-12-31 0000003570 lng:LiquefiedNaturalGasProcuredFromThirdPartiesMemberMember 2018-01-01 2018-12-31 0000003570 lng:LiquefiedNaturalGasProcuredFromThirdPartiesMemberMember 2017-01-01 2017-12-31 0000003570 lng:SabinePassLiquefactionCorpusChristiLiquefactionandCheniereCorpusChristiLiquefactionStageIIIMember lng:NaturalGasSupplyTransportationAndStorageServiceAgreementsMember 2019-01-01 2019-12-31 0000003570 srt:ParentCompanyMember 2019-01-01 2019-12-31 0000003570 us-gaap:DomesticCountryMember 2019-12-31 0000003570 us-gaap:StateAndLocalJurisdictionMember 2019-01-01 2019-12-31 0000003570 us-gaap:DomesticCountryMember us-gaap:InvestmentCreditMember 2019-12-31 0000003570 us-gaap:StateAndLocalJurisdictionMember 2019-12-31 0000003570 lng:StateandForeignCountryMember 2019-01-01 2019-12-31 0000003570 us-gaap:DomesticCountryMember 2019-01-01 2019-12-31 0000003570 us-gaap:PhantomShareUnitsPSUsMember 2019-01-01 2019-12-31 0000003570 us-gaap:PhantomShareUnitsPSUsMember 2019-12-31 0000003570 us-gaap:RestrictedStockMember 2019-12-31 0000003570 lng:RestrictedShareUnitAndPerformanceStockUnitAwardsMember 2019-01-01 2019-12-31 0000003570 us-gaap:RestrictedStockMember 2019-01-01 2019-12-31 0000003570 lng:RestrictedShareUnitAndPerformanceStockUnitAwardsMember 2019-12-31 0000003570 lng:RestrictedShareUnitAndPerformanceStockUnitAwardsMember 2018-12-31 0000003570 us-gaap:RestrictedStockMember 2018-12-31 0000003570 lng:A2003StockIncentivePlanMember 2019-12-31 0000003570 lng:A2011IncentivePlanMember 2017-01-01 2017-01-31 0000003570 us-gaap:PerformanceSharesMember 2019-01-01 2019-12-31 0000003570 lng:A2015InducementPlanMember 2019-12-31 0000003570 us-gaap:RestrictedStockUnitsRSUMember 2019-01-01 2019-12-31 0000003570 srt:MinimumMember us-gaap:PerformanceSharesMember 2019-01-01 2019-12-31 0000003570 srt:MaximumMember us-gaap:PerformanceSharesMember 2019-01-01 2019-12-31 0000003570 us-gaap:PhantomShareUnitsPSUsMember 2017-01-01 2017-12-31 0000003570 us-gaap:PhantomShareUnitsPSUsMember 2018-01-01 2018-12-31 0000003570 us-gaap:RestrictedStockMember 2018-01-01 2018-12-31 0000003570 us-gaap:RestrictedStockMember 2017-01-01 2017-12-31 0000003570 lng:A2011IncentivePlanMember 2019-12-31 0000003570 lng:RestrictedShareUnitAndPerformanceStockUnitAwardsMember 2017-01-01 2017-12-31 0000003570 lng:RestrictedShareUnitAndPerformanceStockUnitAwardsMember 2018-01-01 2018-12-31 0000003570 lng:LiabilityAwardsMember 2019-01-01 2019-12-31 0000003570 lng:LiabilityAwardsMember 2018-01-01 2018-12-31 0000003570 lng:LiabilityAwardsMember 2017-01-01 2017-12-31 0000003570 lng:EquityAwardsMember 2017-01-01 2017-12-31 0000003570 lng:EquityAwardsMember 2018-01-01 2018-12-31 0000003570 lng:EquityAwardsMember 2019-01-01 2019-12-31 0000003570 us-gaap:PhantomShareUnitsPSUsMember 2018-12-31 0000003570 lng:A2021CheniereConvertibleNotes2025CCHHoldCoIIConvertibleNotesAnd2045CheniereConvertibleNotesMember 2019-01-01 2019-12-31 0000003570 lng:StockOptionsWarrantsAndUnvestedStockMember 2019-01-01 2019-12-31 0000003570 lng:A2021CheniereConvertibleNotesAnd2045CheniereConvertibleNotesMember 2017-01-01 2017-12-31 0000003570 lng:StockOptionsWarrantsAndUnvestedStockMember 2017-01-01 2017-12-31 0000003570 lng:A2021CheniereConvertibleNotesAnd2045CheniereConvertibleNotesMember 2018-01-01 2018-12-31 0000003570 lng:StockOptionsWarrantsAndUnvestedStockMember 2018-01-01 2018-12-31 0000003570 lng:RestrictedStockWithUnsatisfiedPerformanceConditionsMember 2018-01-01 2018-12-31 0000003570 lng:RestrictedStockWithUnsatisfiedPerformanceConditionsMember 2019-01-01 2019-12-31 0000003570 lng:RestrictedStockWithUnsatisfiedPerformanceConditionsMember 2017-01-01 2017-12-31 0000003570 lng:SabinePassLiquefactionCorpusChristiLiquefactionandCheniereCorpusChristiLiquefactionStageIIIMember lng:NaturalGasSupplyTransportationAndStorageServiceAgreementsMember 2019-12-31 0000003570 lng:CheniereLNGTerminalsLLCMember lng:ParallaxEnterprisesMember 2015-12-31 0000003570 lng:SabinePassLiquefactionAndCorpusChristiLiquefactionMember lng:BechtelEPCContractsMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionCorpusChristiLiquefactionandCheniereCorpusChristiLiquefactionStageIIIMember srt:MaximumMember us-gaap:InventoriesMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionAndCorpusChristiLiquefactionMember srt:MaximumMember us-gaap:NaturalGasGatheringTransportationMarketingAndProcessingMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionMember srt:MaximumMember us-gaap:NaturalGasStorageMember 2019-01-01 2019-12-31 0000003570 lng:CheniereLNGTerminalsLLCMember lng:ParallaxEnterprisesMember 2016-03-11 2016-03-11 0000003570 lng:SabinePassLiquefactionMember lng:BechtelEPCContractTrainSixMember 2019-01-01 2019-12-31 0000003570 lng:CorpusChristiLiquefactionMember srt:MaximumMember 2019-12-31 0000003570 lng:CorpusChristiLiquefactionMember lng:BechtelEPCContractTrainThreeMember 2019-01-01 2019-12-31 0000003570 lng:CorpusChristiLiquefactionMember srt:MaximumMember us-gaap:NaturalGasStorageMember 2019-01-01 2019-12-31 0000003570 lng:SabinePassLiquefactionMember srt:MaximumMember 2019-12-31 0000003570 lng:CorpusChristiStage3LiquefactionMember srt:MaximumMember 2019-12-31 0000003570 country:KR us-gaap:GeographicConcentrationRiskMember 2017-01-01 2017-12-31 0000003570 country:GB us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 country:IE us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 country:IE us-gaap:GeographicConcentrationRiskMember 2018-01-01 2018-12-31 0000003570 country:IN us-gaap:GeographicConcentrationRiskMember 2018-01-01 2018-12-31 0000003570 us-gaap:GeographicConcentrationRiskMember 2017-01-01 2017-12-31 0000003570 us-gaap:GeographicConcentrationRiskMember 2018-01-01 2018-12-31 0000003570 country:JP us-gaap:GeographicConcentrationRiskMember 2017-01-01 2017-12-31 0000003570 country:GB us-gaap:GeographicConcentrationRiskMember 2018-01-01 2018-12-31 0000003570 lng:OtherNonUsMember us-gaap:GeographicConcentrationRiskMember 2017-01-01 2017-12-31 0000003570 us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 country:IN us-gaap:GeographicConcentrationRiskMember 2017-01-01 2017-12-31 0000003570 country:ES us-gaap:GeographicConcentrationRiskMember 2018-01-01 2018-12-31 0000003570 country:US us-gaap:GeographicConcentrationRiskMember 2017-01-01 2017-12-31 0000003570 country:GB us-gaap:GeographicConcentrationRiskMember 2017-01-01 2017-12-31 0000003570 lng:OtherNonUsMember us-gaap:GeographicConcentrationRiskMember 2018-01-01 2018-12-31 0000003570 country:SG us-gaap:GeographicConcentrationRiskMember 2017-01-01 2017-12-31 0000003570 country:KR us-gaap:GeographicConcentrationRiskMember 2018-01-01 2018-12-31 0000003570 country:IE us-gaap:GeographicConcentrationRiskMember 2017-01-01 2017-12-31 0000003570 country:US us-gaap:GeographicConcentrationRiskMember 2018-01-01 2018-12-31 0000003570 country:SG us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 lng:OtherNonUsMember us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 country:JP us-gaap:GeographicConcentrationRiskMember 2018-01-01 2018-12-31 0000003570 country:KR us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 country:ES us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 country:ES us-gaap:GeographicConcentrationRiskMember 2017-01-01 2017-12-31 0000003570 country:IN us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 country:US us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 country:SG us-gaap:GeographicConcentrationRiskMember 2018-01-01 2018-12-31 0000003570 country:JP us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0000003570 lng:CustomerAMember us-gaap:AccountsReceivableMember 2019-01-01 2019-12-31 0000003570 lng:CustomerEMember us-gaap:SalesRevenueNetMember 2017-01-01 2017-12-31 0000003570 lng:CustomerCMember us-gaap:SalesRevenueNetMember 2017-01-01 2017-12-31 0000003570 lng:CustomerFMember us-gaap:AccountsReceivableMember 2019-01-01 2019-12-31 0000003570 lng:CustomerDMember us-gaap:SalesRevenueNetMember 2018-01-01 2018-12-31 0000003570 lng:CustomerAMember us-gaap:SalesRevenueNetMember 2018-01-01 2018-12-31 0000003570 lng:CustomerBMember us-gaap:AccountsReceivableMember 2018-01-01 2018-12-31 0000003570 lng:CustomerAMember us-gaap:SalesRevenueNetMember 2017-01-01 2017-12-31 0000003570 lng:CustomerBMember us-gaap:SalesRevenueNetMember 2019-01-01 2019-12-31 0000003570 lng:CustomerAMember us-gaap:SalesRevenueNetMember 2019-01-01 2019-12-31 0000003570 lng:CustomerBMember us-gaap:SalesRevenueNetMember 2017-01-01 2017-12-31 0000003570 lng:CustomerCMember us-gaap:SalesRevenueNetMember 2019-01-01 2019-12-31 0000003570 lng:CustomerEMember us-gaap:AccountsReceivableMember 2018-01-01 2018-12-31 0000003570 lng:CustomerCMember us-gaap:SalesRevenueNetMember 2018-01-01 2018-12-31 0000003570 lng:CustomerDMember us-gaap:SalesRevenueNetMember 2019-01-01 2019-12-31 0000003570 lng:CustomerAMember us-gaap:AccountsReceivableMember 2018-01-01 2018-12-31 0000003570 lng:CustomerFMember us-gaap:AccountsReceivableMember 2018-01-01 2018-12-31 0000003570 lng:CustomerBMember us-gaap:SalesRevenueNetMember 2018-01-01 2018-12-31 0000003570 lng:CustomerCMember us-gaap:AccountsReceivableMember 2018-01-01 2018-12-31 0000003570 lng:CustomerEMember us-gaap:AccountsReceivableMember 2019-01-01 2019-12-31 0000003570 lng:CustomerCMember us-gaap:AccountsReceivableMember 2019-01-01 2019-12-31 0000003570 2019-04-01 2019-06-30 0000003570 2019-10-01 2019-12-31 0000003570 2019-01-01 2019-03-31 0000003570 2018-04-01 2018-06-30 0000003570 2018-01-01 2018-03-31 0000003570 2019-07-01 2019-09-30 0000003570 2018-10-01 2018-12-31 0000003570 2018-07-01 2018-09-30 0000003570 srt:ParentCompanyMember 2019-12-31 0000003570 srt:ParentCompanyMember 2018-12-31 0000003570 srt:ParentCompanyMember 2018-01-01 2018-12-31 0000003570 srt:ParentCompanyMember 2017-01-01 2017-12-31 0000003570 srt:ParentCompanyMember us-gaap:AdditionalPaidInCapitalMember 2019-12-31 0000003570 srt:ParentCompanyMember us-gaap:TreasuryStockMember 2017-01-01 2017-12-31 0000003570 srt:ParentCompanyMember us-gaap:CommonStockMember 2017-12-31 0000003570 srt:ParentCompanyMember us-gaap:AdditionalPaidInCapitalMember 2019-01-01 2019-12-31 0000003570 srt:ParentCompanyMember us-gaap:RetainedEarningsMember 2016-12-31 0000003570 srt:ParentCompanyMember us-gaap:CommonStockMember 2016-12-31 0000003570 srt:ParentCompanyMember 2017-12-31 0000003570 srt:ParentCompanyMember us-gaap:TreasuryStockMember 2019-01-01 2019-12-31 0000003570 srt:ParentCompanyMember us-gaap:RetainedEarningsMember 2019-12-31 0000003570 srt:ParentCompanyMember us-gaap:AdditionalPaidInCapitalMember 2017-01-01 2017-12-31 0000003570 srt:ParentCompanyMember us-gaap:CommonStockMember 2018-12-31 0000003570 srt:ParentCompanyMember us-gaap:TreasuryStockMember 2018-01-01 2018-12-31 0000003570 srt:ParentCompanyMember us-gaap:RetainedEarningsMember 2018-01-01 2018-12-31 0000003570 srt:ParentCompanyMember us-gaap:AdditionalPaidInCapitalMember 2017-12-31 0000003570 srt:ParentCompanyMember us-gaap:AdditionalPaidInCapitalMember 2018-01-01 2018-12-31 0000003570 srt:ParentCompanyMember us-gaap:RetainedEarningsMember 2017-12-31 0000003570 srt:ParentCompanyMember 2016-12-31 0000003570 srt:ParentCompanyMember us-gaap:TreasuryStockMember 2018-12-31 0000003570 srt:ParentCompanyMember us-gaap:RetainedEarningsMember 2018-12-31 0000003570 srt:ParentCompanyMember us-gaap:AdditionalPaidInCapitalMember 2016-12-31 0000003570 srt:ParentCompanyMember us-gaap:TreasuryStockMember 2019-12-31 0000003570 srt:ParentCompanyMember us-gaap:AdditionalPaidInCapitalMember 2018-12-31 0000003570 srt:ParentCompanyMember us-gaap:TreasuryStockMember 2017-12-31 0000003570 srt:ParentCompanyMember us-gaap:RetainedEarningsMember 2017-01-01 2017-12-31 0000003570 srt:ParentCompanyMember us-gaap:CommonStockMember 2019-12-31 0000003570 srt:ParentCompanyMember us-gaap:RetainedEarningsMember 2019-01-01 2019-12-31 0000003570 srt:ParentCompanyMember us-gaap:TreasuryStockMember 2016-12-31 0000003570 srt:ParentCompanyMember lng:CheniereRevolvingCreditFacilityMember 2019-12-31 0000003570 srt:ParentCompanyMember srt:MaximumMember 2019-12-31 0000003570 srt:ParentCompanyMember lng:CheniereRevolvingCreditFacilityMember 2018-12-31 0000003570 srt:ParentCompanyMember us-gaap:AccountingStandardsUpdate201602Member 2019-01-01 0000003570 srt:ParentCompanyMember lng:CheniereRevolvingCreditFacilityMember 2018-12-01 0000003570 srt:ParentCompanyMember lng:CurrentOperatingLeaseLiabilitiesMember 2019-12-31 0000003570 srt:ParentCompanyMember lng:NonCurrentOperatingLeaseLiabilitiesMember 2019-12-31 0000003570 srt:ParentCompanyMember lng:OperatingLeaseAssetsMember 2019-12-31 0000003570 srt:ParentCompanyMember lng:A2021ConvertibleUnsecuredNotesMember 2018-12-31 0000003570 srt:ParentCompanyMember lng:A2021ConvertibleUnsecuredNotesMember 2019-12-31 0000003570 srt:ParentCompanyMember lng:A2045ConvertibleSeniorNotesMember 2019-12-31 0000003570 srt:ParentCompanyMember lng:A2045ConvertibleSeniorNotesMember 2018-12-31 lng:unit xbrli:shares iso4217:USD lng:customer utreg:mi lng:item lng:tbtu lng:milliontonnes utreg:Y lng:trains iso4217:USD xbrli:shares xbrli:pure utreg:D lng:members utreg:Rate utreg:bcf utreg:D



 
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended December 31, 2019
or
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from            to            
Commission file number 001-16383
colorlogoonwhitecmyka49.gif
CHENIERE ENERGY, INC.
(Exact name of registrant as specified in its charter)
Delaware
95-4352386
(State or other jurisdiction of incorporation or organization)
(I.R.S. Employer Identification No.)
700 Milam Street, Suite 1900
Houston, Texas 77002
(Address of principal executive offices) (Zip Code)
(713375-5000
(Registrant’s telephone number, including area code)
Securities registered pursuant to Section 12(b) of the Act: 
Title of each class
Trading Symbol
Name of each exchange on which registered
Common Stock, $ 0.003 par value
LNG
NYSE American
Securities registered pursuant to Section 12(g) of the Act: None 
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.  Yes    No 
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes    No   
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes    No 
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).  Yes     No 
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
 
Large accelerated filer
 
Accelerated filer
 
Non-accelerated filer
 
Smaller reporting company
 
 
 
 
Emerging growth company
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act). Yes    No   
The aggregate market value of the registrant’s Common Stock held by non-affiliates of the registrant was approximately $17.5 billion as of June 28, 2019.
As of February 19, 2020, the issuer had 254,084,493 shares of Common Stock outstanding.
Documents incorporated by reference: The definitive proxy statement for the registrant’s Annual Meeting of Stockholders (to be filed within 120 days of the close of the registrant’s fiscal year) is incorporated by reference into Part III.
 



CHENIERE ENERGY, INC.
TABLE OF CONTENTS





i


DEFINITIONS
As used in this annual report, the terms listed below have the following meanings: 

Common Industry and Other Terms
Bcf
 
billion cubic feet
Bcf/d
 
billion cubic feet per day
Bcf/yr
 
billion cubic feet per year
Bcfe
 
billion cubic feet equivalent
DOE
 
U.S. Department of Energy
EPC
 
engineering, procurement and construction
FERC
 
Federal Energy Regulatory Commission
FTA countries
 
countries with which the United States has a free trade agreement providing for national treatment for trade in natural gas
GAAP
 
generally accepted accounting principles in the United States
Henry Hub
 
the final settlement price (in USD per MMBtu) for the New York Mercantile Exchange’s Henry Hub natural gas futures contract for the month in which a relevant cargo’s delivery window is scheduled to begin
LIBOR
 
London Interbank Offered Rate
LNG
 
liquefied natural gas, a product of natural gas that, through a refrigeration process, has been cooled to a liquid state, which occupies a volume that is approximately 1/600th of its gaseous state
MMBtu
 
million British thermal units, an energy unit
mtpa
 
million tonnes per annum
non-FTA countries
 
countries with which the United States does not have a free trade agreement providing for national treatment for trade in natural gas and with which trade is permitted
SEC
 
U.S. Securities and Exchange Commission
SPA
 
LNG sale and purchase agreement
TBtu
 
trillion British thermal units, an energy unit
Train
 
an industrial facility comprised of a series of refrigerant compressor loops used to cool natural gas into LNG
TUA
 
terminal use agreement


1


Abbreviated Legal Entity Structure

The following diagram depicts our abbreviated legal entity structure as of December 31, 2019, including our ownership of certain subsidiaries, and the references to these entities used in this annual report:
ceiorgchart63019a02.gif
Unless the context requires otherwise, references to “Cheniere,” the “Company,” “we,” “us” and “our” refer to Cheniere Energy, Inc. and its consolidated subsidiaries, including our publicly traded subsidiary, Cheniere Partners.
Unless the context requires otherwise, references to the “CCH Group” refer to CCH HoldCo II, CCH HoldCo I, CCH, CCL and CCP, collectively.
During the year ended December 31, 2018, we closed the merger of Cheniere Energy Partners LP Holdings, LLC (“Cheniere Holdings”) with and into our wholly owned subsidiary. As a result of the merger, Cheniere Holdings is no longer a publicly-traded company.


2


CAUTIONARY STATEMENT
REGARDING FORWARD-LOOKING STATEMENTS


This annual report contains certain statements that are, or may be deemed to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). All statements, other than statements of historical or present facts or conditions, included herein or incorporated herein by reference are “forward-looking statements.” Included among “forward-looking statements” are, among other things: 
statements that we expect to commence or complete construction of our proposed LNG terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions or portions thereof, by certain dates, or at all;
statements regarding future levels of domestic and international natural gas production, supply or consumption or future levels of LNG imports into or exports from North America and other countries worldwide or purchases of natural gas, regardless of the source of such information, or the transportation or other infrastructure or demand for and prices related to natural gas, LNG or other hydrocarbon products;
statements regarding any financing transactions or arrangements, or our ability to enter into such transactions;
statements regarding the amount and timing of share repurchases;
statements relating to the construction of our Trains and pipelines, including statements concerning the engagement of any EPC contractor or other contractor and the anticipated terms and provisions of any agreement with any EPC or other contractor, and anticipated costs related thereto;
statements regarding any SPA or other agreement to be entered into or performed substantially in the future, including any revenues anticipated to be received and the anticipated timing thereof, and statements regarding the amounts of total LNG regasification, natural gas liquefaction or storage capacities that are, or may become, subject to contracts;
statements regarding counterparties to our commercial contracts, construction contracts and other contracts;
statements regarding our planned development and construction of additional Trains or pipelines, including the financing of such Trains or pipelines;
statements that our Trains, when completed, will have certain characteristics, including amounts of liquefaction capacities;
statements regarding our business strategy, our strengths, our business and operation plans or any other plans, forecasts, projections, or objectives, including anticipated revenues, capital expenditures, maintenance and operating costs and cash flows, any or all of which are subject to change;
statements regarding legislative, governmental, regulatory, administrative or other public body actions, approvals, requirements, permits, applications, filings, investigations, proceedings or decisions;
statements regarding our anticipated LNG and natural gas marketing activities; and
any other statements that relate to non-historical or future information.
All of these types of statements, other than statements of historical or present facts or conditions, are forward-looking statements. In some cases, forward-looking statements can be identified by terminology such as “may,” “will,” “could,” “should,” “achieve,” “anticipate,” “believe,” “contemplate,” “continue,” “estimate,” “expect,” “intend,” “plan,” “potential,” “predict,” “project,” “pursue,” “target,” the negative of such terms or other comparable terminology. The forward-looking statements contained in this annual report are largely based on our expectations, which reflect estimates and assumptions made by our management. These estimates and assumptions reflect our best judgment based on currently known market conditions and other factors. Although we believe that such estimates are reasonable, they are inherently uncertain and involve a number of risks and uncertainties beyond our control. In addition, assumptions may prove to be inaccurate. We caution that the forward-looking statements contained in this annual report are not guarantees of future performance and that such statements may not be realized or the forward-looking statements or events may not occur. Actual results may differ materially from those anticipated or implied in forward-looking statements as a result of a variety of factors described in this annual report and in the other reports and other information that we file with the SEC. All forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by these risk factors. These forward-looking statements speak only as of the date made, and other than as required by law, we undertake no obligation to update or revise any forward-looking statement or provide reasons why actual results may differ, whether as a result of new information, future events or otherwise.


3




PART I

ITEMS 1. AND 2.
BUSINESS AND PROPERTIES

General
 
Cheniere Energy, Inc. (“Cheniere”), a Delaware corporation, was organized in 1983 and is a Houston-based energy infrastructure company primarily engaged in LNG-related businesses. We provide clean, secure and affordable LNG to integrated energy companies, utilities and energy trading companies around the world. We aspire to conduct our business in a safe and responsible manner, delivering a reliable, competitive and integrated source of LNG to our customers. We own and operate the Sabine Pass LNG terminal in Louisiana, one of the largest LNG production facilities in the world, through our ownership interest in and management agreements with Cheniere Energy Partners, L.P. (“Cheniere Partners”), which is a publicly traded limited partnership that we created in 2007. As of December 31, 2019, we owned 100% of the general partner interest and 48.6% of the limited partner interest in Cheniere Partners. We also own and operate the Corpus Christi LNG terminal in Texas, which is wholly owned by us.

The Sabine Pass LNG terminal is located in Cameron Parish, Louisiana, on the Sabine-Neches Waterway less than four miles from the Gulf Coast. Cheniere Partners, through its subsidiary Sabine Pass Liquefaction, LLC (“SPL”), is currently operating five natural gas liquefaction Trains and is constructing one additional Train for a total production capacity of approximately 30 mtpa of LNG (the “SPL Project”) at the Sabine Pass LNG terminal. The Sabine Pass LNG terminal has operational regasification facilities owned by Cheniere Partners’ subsidiary, Sabine Pass LNG, L.P. (“SPLNG”), that include pre-existing infrastructure of five LNG storage tanks with aggregate capacity of approximately 17 Bcfe, two marine berths that can each accommodate vessels with nominal capacity of up to 266,000 cubic meters and vaporizers with regasification capacity of approximately 4 Bcf/d. Cheniere Partners also owns a 94-mile pipeline through its subsidiary, Cheniere Creole Trail Pipeline, L.P. (“CTPL”), that interconnects the Sabine Pass LNG terminal with a number of large interstate pipelines (the “Creole Trail Pipeline”).

We also own the Corpus Christi LNG terminal near Corpus Christi, Texas, and are currently operating two Trains and are constructing one additional Train for a total production capacity of approximately 15 mtpa of LNG. Additionally, we are operating a 23-mile natural gas supply pipeline that interconnects the Corpus Christi LNG terminal with several interstate and intrastate natural gas pipelines (the “Corpus Christi Pipeline” and together with the Trains, the “CCL Project”) through our subsidiaries Corpus Christi Liquefaction, LLC (“CCL”) and Cheniere Corpus Christi Pipeline, L.P. (“CCP”), respectively. The CCL Project, once fully constructed, will contain three LNG storage tanks with aggregate capacity of approximately 10 Bcfe and two marine berths that can each accommodate vessels with nominal capacity of up to 266,000 cubic meters.

We have contracted approximately 85% of the total production capacity from the SPL Project and the CCL Project (collectively, the “Liquefaction Projects”) on a term basis. This includes volumes contracted under SPAs in which the customers are required to pay a fixed fee with respect to the contracted volumes irrespective of their election to cancel or suspend deliveries of LNG cargoes, as well as volumes contracted under integrated production marketing (“IPM”) gas supply agreements.

Additionally, separate from the CCH Group, we are developing an expansion of the Corpus Christi LNG terminal adjacent to the CCL Project (“Corpus Christi Stage 3”) through our subsidiary Cheniere Corpus Christi Liquefaction Stage III, LLC (“CCL Stage III”) for up to seven midscale Trains with an expected total production capacity of approximately 10 mtpa of LNG. We received approval from FERC in November 2019 to site, construct and operate the expansion project.

We remain focused on operational excellence and customer satisfaction. Increasing demand of LNG has allowed us to expand our liquefaction infrastructure in a financially disciplined manner. We hold significant land positions at both the Sabine Pass LNG terminal and the Corpus Christi LNG terminal which provide opportunity for further liquefaction capacity expansion. The development of these sites or other projects, including infrastructure projects in support of natural gas supply and LNG demand, will require, among other things, acceptable commercial and financing arrangements before we can make a final investment decision (“FID”).

4




Although results are consolidated for financial reporting, Cheniere, Cheniere Partners, SPL and the CCH Group operate with independent capital structures. The following diagram depicts our abbreviated capital structure as of December 31, 2019:
ceicapitalstructure2019.gif

Our Business Strategy

Our primary business strategy is to be a full service LNG provider to worldwide end-use customers. We accomplish this objective by owning, constructing and operating LNG and natural gas infrastructure facilities to meet our long-term customers’ energy demands and: 
safely, efficiently and reliably operating and maintaining our assets;
procuring natural gas and pipeline transport capacity to our facilities;
commencing commercial delivery for our long-term SPA customers, of which we have initiated for 13 of 19 long-term SPA customers as of December 31, 2019;
safely, on-time and on-budget completing our expansion construction projects, including the development of Corpus Christi Stage 3;
maximizing the production of LNG to serve our long-term customers and generating steady and stable revenues and operating cash flows; and
maintaining a flexible capital structure to finance the acquisition, development, construction and operation of the energy assets needed to supply our customers.


5




LNG Terminals and Marketing
 
We shipped our first LNG cargo in February 2016 and we shipped our 1,000th cargo in January 2020. Cheniere’s LNG has been shipped to over 30 countries and regions around the world.

Sabine Pass LNG Terminal

Liquefaction Facilities

The SPL Project is one of the largest LNG production facilities in the world. Through Cheniere Partners, we are currently operating five Trains and two marine berths at the SPL Project and are constructing one additional Train. We have received authorization from the FERC to site, construct and operate Trains 1 through 6. We have achieved substantial completion of the first five Trains of the SPL Project and commenced commercial operating activities for each Train at various times starting in May 2016. The following table summarizes the project completion and construction status of Train 6 of the SPL Project as of December 31, 2019:
 
 
SPL Train 6
Overall project completion percentage
 
43.7%
Completion percentage of:
 

Engineering
 
91.5%
Procurement
 
60.9%
Subcontract work
 
37.4%
Construction
 
9.7%
Date of expected substantial completion
 
1H 2023

The following orders have been issued by the DOE authorizing the export of domestically produced LNG by vessel from the Sabine Pass LNG terminal:
Trains 1 through 4—FTA countries for a 30-year term, which commenced in May 2016, and non-FTA countries for a 20-year term, which commenced in June 2016, in an amount up to a combined total of the equivalent of 16 mtpa (approximately 803 Bcf/yr of natural gas).
Trains 1 through 4—FTA countries for a 25-year term and non-FTA countries for a 20-year term, both of which commenced in December 2018, in an amount up to a combined total of the equivalent of approximately 203 Bcf/yr of natural gas (approximately 4 mtpa).
Trains 5 and 6—FTA countries and non-FTA countries for a 20-year term, which partially commenced in June 2019 and the remainder commenced in September 2019, in an amount up to a combined total of 503.3 Bcf/yr of natural gas (approximately 10 mtpa).

In each case, the terms of these authorizations began on the earlier of the date of first export thereunder or the date specified in the particular order. In addition, SPL received an order providing for a three-year makeup period with respect to each of the non-FTA orders for LNG volumes SPL was authorized but unable to export during any portion of the initial 20-year export period of such order.

The DOE issued orders authorizing SPL to export domestically produced LNG by vessel from the Sabine Pass LNG terminal to FTA countries and non-FTA countries over a two-year period commencing January 2020, in an aggregate amount up to the equivalent of 600 Bcf of natural gas (however, exports under this order, when combined with exports under the orders above, may not exceed 1,509 Bcf/yr).

An application was filed in September 2019 to authorize additional exports from the SPL Project to FTA countries for a 25-year term and to non-FTA countries for a 20-year term in an amount up to the equivalent of approximately 153 Bcf/yr of natural gas, for a total SPL Project export of approximately 1,662 Bcf/yr. The terms of the authorizations are requested to commence on the date of first commercial export from the SPL Project of the volumes contemplated in the application. The application is currently pending before DOE.


6




Customers

SPL has entered into fixed price long-term SPAs generally with terms of 20 years (plus extension rights) with eight third parties for Trains 1 through 6 of the SPL Project. Under these SPAs, the customers will purchase LNG from SPL on a free on board (“FOB”) basis for a price consisting of a fixed fee per MMBtu of LNG (a portion of which is subject to annual adjustment for inflation) plus a variable fee per MMBtu of LNG equal to approximately 115% of Henry Hub. The customers may elect to cancel or suspend deliveries of LNG cargoes, with advance notice as governed by each respective SPA, in which case the customers would still be required to pay the fixed fee with respect to the contracted volumes that are not delivered as a result of such cancellation or suspension. We refer to the fee component that is applicable regardless of a cancellation or suspension of LNG cargo deliveries under the SPAs as the fixed fee component of the price under SPL’s SPAs. We refer to the fee component that is applicable only in connection with LNG cargo deliveries as the variable fee component of the price under SPL’s SPAs. The variable fees under SPL’s SPAs were generally sized at the time of entry into each SPA with the intent to cover the costs of gas purchases and transportation and liquefaction fuel to produce the LNG to be sold under each such SPA. The SPAs and contracted volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA generally commences upon the date of first commercial delivery of a specified Train.

In aggregate, the annual fixed fee portion to be paid by the third-party SPA customers is approximately $2.9 billion for Trains 1 through 5. After giving effect to an SPA that Cheniere has committed to provide to SPL by the end of 2020, the annual fixed fee portion to be paid by the third-party SPA customers would increase to at least $3.3 billion, which is expected to occur upon the date of first commercial delivery of Train 6.

In addition, Cheniere Marketing has agreements with SPL to purchase, at Cheniere Marketing’s option, any LNG produced by SPL in excess of that required for other customers. See Marketing section for additional information regarding agreements entered into by Cheniere Marketing.

The annual contracted cash flows from fixed fees of each buyer of LNG under SPL’s third-party SPAs that constitute more than 10% of SPL’s aggregate fixed fees under all its SPAs are:
approximately $720 million from BG Gulf Coast LNG, LLC (“BG”), which is guaranteed by BG Energy Holdings Limited;
approximately $550 million from Korea Gas Corporation (“KOGAS”);
approximately $550 million from GAIL;
approximately $450 million from Naturgy LNG GOM, Limited (formerly known as Gas Natural Fenosa LNG GOM, Limited) (“Naturgy”), which is guaranteed by Naturgy Energy Group, S.A. (formerly known as Gas Natural SDG S.A.); and
approximately $310 million from Total Gas & Power North America, Inc. (“Total”), which is guaranteed by Total S.A.

The annual aggregate fixed fees for all of SPL’s other SPAs with third-parties is approximately $490 million, prior to giving effect to an SPA that Cheniere has committed to provide to SPL by the end of 2020.

Natural Gas Transportation, Storage and Supply

To ensure SPL is able to transport adequate natural gas feedstock to the Sabine Pass LNG terminal, it has entered into transportation precedent and other agreements to secure firm pipeline transportation capacity with CTPL and third-party pipeline companies. SPL has entered into firm storage services agreements with third parties to assist in managing variability in natural gas needs for the SPL Project. SPL has also entered into enabling agreements and long-term natural gas supply contracts with third parties in order to secure natural gas feedstock for the SPL Project. As of December 31, 2019, SPL had secured up to approximately 3,850 TBtu of natural gas feedstock through long-term and short-term natural gas supply contracts with remaining terms that range up to 10 years, a portion of which is subject to conditions precedent.

Construction

SPL entered into lump sum turnkey contracts with Bechtel Oil, Gas and Chemicals, Inc. (“Bechtel”) for the engineering, procurement and construction of Trains 1 through 6 of the SPL Project, under which Bechtel charges a lump sum for all work

7




performed and generally bears project cost, schedule and performance risks unless certain specified events occur, in which case Bechtel may cause SPL to enter into a change order, or SPL agrees with Bechtel to a change order.
The total contract price of the EPC contract for Train 6 of the SPL Project is approximately $2.5 billion, including estimated costs for an optional third marine berth. As of December 31, 2019, we have incurred $1.1 billion under this contract.

Regasification Facilities
 
The Sabine Pass LNG terminal has operational regasification capacity of approximately 4 Bcf/d and aggregate LNG storage capacity of approximately 17 Bcfe. Approximately 2 Bcf/d of the regasification capacity at the Sabine Pass LNG terminal has been reserved under two long-term third-party TUAs, under which SPLNG’s customers are required to pay fixed monthly fees, whether or not they use the LNG terminal.  Each of Total and Chevron U.S.A. Inc. (“Chevron”) has reserved approximately 1 Bcf/d of regasification capacity and is obligated to make monthly capacity payments to SPLNG aggregating approximately $125 million annually, prior to inflation adjustments, for 20 years that commenced in 2009. Total S.A. has guaranteed Total’s obligations under its TUA up to $2.5 billion, subject to certain exceptions, and Chevron Corporation has guaranteed Chevron’s obligations under its TUA up to 80% of the fees payable by Chevron.

The remaining approximately 2 Bcf/d of capacity has been reserved under a TUA by SPL. SPL is obligated to make monthly capacity payments to SPLNG aggregating approximately $250 million annually, prior to inflation adjustments, continuing until at least May 2036. SPL entered into a partial TUA assignment agreement with Total, whereby upon substantial completion of Train 5 of the SPL Project, SPL gained access to substantially all of Total’s capacity and other services provided under Total’s TUA with SPLNG. This agreement provides SPL with additional berthing and storage capacity at the Sabine Pass LNG terminal that may be used to provide increased flexibility in managing LNG cargo loading and unloading activity, permit SPL to more flexibly manage its LNG storage capacity and accommodate the development of Train 6. Notwithstanding any arrangements between Total and SPL, payments required to be made by Total to SPLNG will continue to be made by Total to SPLNG in accordance with its TUA. During the years ended December 31, 2019, 2018 and 2017, SPL recorded $104 million, $30 million and $23 million, respectively, as operating and maintenance expense under this partial TUA assignment agreement.

Under each of these TUAs, SPLNG is entitled to retain 2% of the LNG delivered to the Sabine Pass LNG terminal.

Corpus Christi LNG Terminal

Liquefaction Facilities

We are currently operating two Trains and one marine berth at the CCL Project and are constructing one additional Train and marine berth. We have received authorization from the FERC to site, construct and operate Trains 1 through 3 of the CCL Project. We completed construction of Trains 1 and 2 of the CCL Project and commenced commercial operating activities in February 2019 and August 2019, respectively. The following table summarizes the project completion and construction status of Train 3 of the CCL Project, including the related infrastructure, as of December 31, 2019:
 
 
CCL Train 3
Overall project completion percentage
 
74.8%
Completion percentage of:
 
 
Engineering
 
98.7%
Procurement
 
99.5%
Subcontract work
 
28.3%
Construction
 
49.5%
Expected date of substantial completion
 
1H 2021

Separate from the CCH Group, we are also developing Corpus Christi Stage 3 through our subsidiary CCL Stage III, adjacent to the CCL Project. We received approval from FERC in November 2019 to site, construct and operate seven midscale Trains with an expected total production capacity of approximately 10 mtpa of LNG.


8




The following orders have been issued by the DOE authorizing the export of domestically produced LNG by vessel from the Corpus Christi LNG terminal:
CCL ProjectFTA countries for a 25-year term and to non-FTA countries for a 20-year term, both of which commenced in June 2019, up to a combined total of the equivalent of 767 Bcf/yr (approximately 15 mtpa) of natural gas.
Corpus Christi Stage 3FTA countries for a 25-year term and to non-FTA countries for a 20-year term in an amount equivalent to 582.14 Bcf/yr (approximately 11 mtpa) of natural gas.

In each case, the terms of these authorizations begin on the earlier of the date of first export thereunder or the date specified in the particular order, which ranges from seven to 10 years from the date the order was issued.

An application was filed in September 2019 to authorize additional exports from the CCL Project to FTA countries for a 25-year term and to non-FTA countries for a 20-year term in an amount up to the equivalent of approximately 108 Bcf/yr of natural gas, for a total CCL Project export of 875.16 Bcf/yr. The terms of the authorizations are requested to commence on the date of first commercial export from the CCL Project of the volumes contemplated in the application. The application is currently pending before DOE.

Customers

CCL has entered into fixed price long-term SPAs generally with terms of 20 years (plus extension rights) with nine third parties for Trains 1 through 3 of the CCL Project. Under these SPAs, the customers will purchase LNG from CCL on a FOB basis for a price consisting of a fixed fee per MMBtu of LNG (a portion of which is subject to annual adjustment for inflation) plus a variable fee per MMBtu of LNG equal to approximately 115% of Henry Hub. The customers may elect to cancel or suspend deliveries of LNG cargoes, with advance notice as governed by each respective SPA, in which case the customers would still be required to pay the fixed fee with respect to the contracted volumes that are not delivered as a result of such cancellation or suspension. We refer to the fee component that is applicable regardless of a cancellation or suspension of LNG cargo deliveries under the SPAs as the fixed fee component of the price under our SPAs. We refer to the fee component that is applicable only in connection with LNG cargo deliveries as the variable fee component of the price under our SPAs. The variable fee under CCL’s SPAs entered into in connection with the development of the CCL Project was sized at the time of entry into each SPA with the intent to cover the costs of gas purchases and transportation and liquefaction fuel to produce the LNG to be sold under each such SPA. The SPAs and contracted volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA generally commences upon the date of first commercial delivery for the applicable Train, as specified in each SPA.

In aggregate, the minimum fixed fee portion to be paid by the third-party SPA customers is approximately $550 million for Train 1, increasing to approximately $1.4 billion upon the date of first commercial delivery for Train 2 and further increasing to approximately $1.8 billion following the substantial completion of Train 3 of the CCL Project.

The annual contracted cash flows from fixed fees of each buyer of LNG under CCL’s third-party SPAs that constitute more than 10% of CCL’s aggregate fixed fees under all its SPAs for Trains 1 through 3 of the CCL Project are:
approximately $410 million from Endesa S.A.;
approximately $280 million from PT Pertamina (Persero); and
approximately $270 million from Naturgy, which is guaranteed by Naturgy Energy Group, S.A.

The average annual contracted cash flow from fixed fees for all of CCL’s other SPAs with third-parties is approximately $790 million.

In addition, Cheniere Marketing has agreements with CCL to purchase: (1) 15 TBtu per annum of LNG with an approximate term of 23 years, (2) any LNG produced by CCL in excess of that required for other customers at Cheniere Marketing’s option and (3) 0.85 mtpa of LNG with a term of up to seven years associated with an IPM gas supply agreement, as described below. See Marketing section for additional information regarding agreements entered into by Cheniere Marketing.

Natural Gas Transportation, Storage and Supply

To ensure CCL is able to transport adequate natural gas feedstock to the Corpus Christi LNG terminal, it has entered into transportation precedent agreements to secure firm pipeline transportation capacity with CCP and certain third-party pipeline

9




companies. CCL has entered into a firm storage services agreement with a third party to assist in managing variability in natural gas needs for the CCL Project. CCL has also entered into enabling agreements and long-term natural gas supply contracts with third parties, and will continue to enter into such agreements, in order to secure natural gas feedstock for the CCL Project. As of December 31, 2019, CCL had secured up to approximately 2,999 TBtu of natural gas feedstock through long-term natural gas supply contracts with remaining terms that range up to eight years, a portion of which is subject to the achievement of certain project milestones and other conditions precedent.
CCL Stage III has also entered into long-term natural gas supply contracts with third parties, and anticipates continuing to enter into such agreements, in order to secure natural gas feedstock for Corpus Christi Stage 3. As of December 31, 2019, CCL Stage III had secured up to approximately 2,361 TBtu of natural gas feedstock through long-term natural gas supply contracts with remaining terms that range up to approximately 15 years, which is subject to the achievement of certain project milestones and other conditions precedent.

A portion of the natural gas feedstock transactions for CCL and CCL Stage III are IPM transactions, in which the natural gas producers are paid based on a global gas market price less a fixed liquefaction fee and certain costs incurred by us.
  
Construction

CCL entered into separate lump sum turnkey contracts with Bechtel for the engineering, procurement and construction of Trains 1 through 3 of the CCL Project under which Bechtel charges a lump sum for all work performed and generally bears project cost, schedule and performance risks unless certain specified events occur, in which case Bechtel may cause CCL to enter into a change order, or CCL agrees with Bechtel to a change order.

The total contract price of the EPC contract for Train 3, which is currently under construction, is approximately $2.4 billion, reflecting amounts incurred under change orders through December 31, 2019. As of December 31, 2019, we have incurred $2.0 billion under this contract.

Final Investment Decision for Corpus Christi Stage 3

FID for Corpus Christi Stage 3 will be subject to, among other things, entering into an EPC contract, obtaining additional commercial support for the project and securing the necessary financing arrangements.

Pipeline Facilities

In December 2014, the FERC issued a certificate of public convenience and necessity under Section 7(c) of the Natural Gas Act of 1938, as amended (the “NGA”), authorizing CCP to construct and operate the Corpus Christi Pipeline. The Corpus Christi Pipeline is designed to transport 2.25 Bcf/d of natural gas feedstock required by the CCL Project from the existing regional natural gas pipeline grid. The construction of the Corpus Christi Pipeline was completed in the second quarter of 2018.

In November 2019, the FERC authorized CCP to construct and operate the pipeline for Corpus Christi Stage 3. The pipeline will be designed to transport 1.5 Bcf/d of natural gas feedstock required by Corpus Christi Stage 3 from the existing regional natural gas pipeline grid.

Marketing

We market and sell LNG produced by the Liquefaction Projects that is not required for other customers through our integrated marketing function. We have, and continue to develop, a portfolio of long-, medium- and short-term SPAs to transport and unload commercial LNG cargoes to locations worldwide. These volumes are expected to be primarily sourced by LNG produced by the Liquefaction Projects but supplemented by volumes procured from other locations worldwide, as needed. As of December 31, 2019, we have sold or have options to sell approximately 4,935 TBtu of LNG to be delivered to customers between 2020 and 2045, excluding volumes for agreements anticipated to be assigned to SPL in the future.  The cargoes have been sold either on a FOB basis (delivered to the customer at the Sabine Pass LNG terminal or the Corpus Christi LNG terminal, as applicable) or a delivered at terminal (“DAT”) basis (delivered to the customer at their LNG receiving terminal). We have chartered LNG vessels to be utilized for cargoes sold on a DAT basis. In addition, we have entered into a long-term agreement to sell LNG cargoes on a DAT basis that is conditioned upon the buyer achieving certain milestones.


10




Significant Customers

The following table shows customers with revenues of 10% or greater of total revenues from external customers:
 
Percentage of Total Revenues from External Customers
 
Year Ended December 31,
 
2019
 
2018
 
2017
BG and its affiliates
16%
 
18%
 
24%
Naturgy
10%
 
14%
 
14%
KOGAS
11%
 
19%
 
14%
GAIL
11%
 
13%
 
*
JERA Co., Inc.
*
 
*
 
17%
 
* Less than 10%

Competition

If and when SPL, CCL or our integrated marketing function need to replace any existing SPA or enter into new SPAs, they will compete on the basis of price per contracted volume of LNG with each other and other natural gas liquefaction projects throughout the world. Revenues associated with any incremental volumes, including those sold by our integrated marketing function discussed above, will also be subject to market-based price competition. Many of the companies with which we compete are major energy corporations with longer operating histories, more development experience, greater name recognition, greater financial, technical and marketing resources and greater access to markets than us. We have proximity to our customers, with offices located in Houston, London, Singapore, Beijing and Tokyo.

SPLNG currently does not experience competition for its terminal capacity because the entire approximately 4 Bcf/d of regasification capacity that is available at the Sabine Pass LNG terminal has been fully contracted. If and when SPLNG has to replace any TUAs, it will compete with other then-existing LNG terminals for customers.

Governmental Regulation
 
Our LNG terminals and pipelines are subject to extensive regulation under federal, state and local statutes, rules, regulations and laws. These laws require that we engage in consultations with appropriate federal and state agencies and that we obtain and maintain applicable permits and other authorizations. These regulatory requirements increase the cost of construction and operation, and failure to comply with such laws could result in substantial penalties and/or loss of necessary authorizations.

Federal Energy Regulatory Commission
The design, construction, operation, maintenance and expansion of our liquefaction facilities, the import or export of LNG and the purchase and transportation of natural gas in interstate commerce through our pipelines (including our Creole Trail Pipeline and Corpus Christi Pipeline) are highly regulated activities subject to the jurisdiction of the FERC pursuant to the NGA. Under the NGA, the FERC’s jurisdiction generally extends to the transportation of natural gas in interstate commerce, to the sale for resale of natural gas in interstate commerce, to natural gas companies engaged in such transportation or sale and to the construction, operation, maintenance and expansion of LNG terminals and interstate natural gas pipelines.

 The FERC’s authority to regulate interstate natural gas pipelines and the services that they provide generally includes regulation of:

rates and charges, and terms and conditions for natural gas transportation, storage and related services;
the certification and construction of new facilities and modification of existing facilities;
the extension and abandonment of services and facilities;
the administration of accounting and financial reporting regulations, including the maintenance of accounts and records;
the acquisition and disposition of facilities;

11




the initiation and discontinuation of services; and
various other matters.

Under the NGA, our pipelines are not permitted to unduly discriminate or grant undue preference as to rates or the terms and conditions of service to any shipper, including its own marketing affiliate. Those rates, terms and conditions must be public, and on file with the FERC. In contrast to pipeline regulation, the FERC does not require LNG terminal owners to provide open-access services at cost-based or regulated rates. Although the provisions that codified FERC’s policy in this area expired on January 1, 2015, we see no indication that the FERC intends to change its policy in this area.

We are permitted to make sales of natural gas for resale in interstate commerce pursuant to a blanket marketing certificate automatically granted by the FERC to our marketing affiliates. Our sales of natural gas will be affected by the availability, terms and cost of pipeline transportation. As noted above, the price and terms of access to pipeline transportation are subject to extensive federal and state regulation.

In order to site, construct and operate our LNG terminals, we received and are required to maintain authorizations from the FERC under Section 3 of the NGA as well as other material governmental and regulatory approvals and permits. The Energy Policy Act of 2005 (the “EPAct”) amended Section 3 of the NGA to establish or clarify the FERC’s exclusive authority to approve or deny an application for the siting, construction, expansion or operation of LNG terminals, unless specifically provided otherwise in the EPAct, amendments to the NGA. For example, nothing in the EPAct amendments to the NGA were intended to affect otherwise applicable law related to any other federal agency’s authorities or responsibilities related to LNG terminals or those of a state acting under federal law.

The FERC issued final orders in April and July 2012 approving our application for an order under Section 3 of the NGA authorizing the siting, construction and operation of Trains 1 through 4 of the SPL Project (and related facilities). Subsequently, the FERC issued written approval to commence site preparation work for Trains 1 through 4. In October 2012, we applied to amend the FERC approval to reflect certain modifications to the SPL Project, and in August 2013, the FERC issued an order approving the modifications. In October 2013, we applied to further amend the FERC approval, requesting authorization to increase the total permitted LNG production capacity of Trains 1 through 4 from the then authorized 803 Bcf/yr to 1,006 Bcf/yr so as to more accurately reflect the estimated maximum LNG production capacity of Trains 1 through 4. In February 2014, the FERC issued an order approving the October 2013 application (the “February 2014 Order”). A party to the proceeding requested a rehearing of the February 2014 Order, and in September 2014, the FERC issued an order denying the rehearing request (the “FERC Order Denying Rehearing”). The party petitioned the U.S. Court of Appeals for the District of Columbia Circuit (the “Court of Appeals”) to review the February 2014 Order and the FERC Order Denying Rehearing. The court denied the petition in June 2016. In September 2013, we filed an application with the FERC for authorization to add Trains 5 and 6 to the SPL Project, which was granted by the FERC in an order issued in April 2015 and an order denying rehearing issued in June 2015. These orders are not subject to appellate court review. In October of 2018, SPL applied to the FERC for authorization to add a third marine berth to the Sabine Pass LNG terminal facilities.

The Creole Trail Pipeline, which interconnects with the Sabine Pass LNG terminal, holds a certificate of public convenience and necessity from the FERC under Section 7 of the NGA. The FERC’s approval under Section 7 of the NGA, as well as several other material governmental and regulatory approvals and permits, may be required prior to making any modifications to the Creole Trail Pipeline as it is a regulated, interstate natural gas pipeline. In 2013, the FERC approved CTPL’s application for authorization to construct, own, operate and maintain certain new facilities in order to enable bi-directional natural gas flow on the Creole Trail Pipeline system to allow for the delivery of up to 1,530,000 Dekatherms per day of feed gas to the Sabine Pass LNG terminal. In November 2013, CTPL received approval from the Louisiana Department of Environmental Quality (“LDEQ”) for the proposed modifications and, with subsequent final FERC clearance, construction was completed in 2015. In September 2013, we filed an application with the FERC for authorization to construct and operate an extension and expansion of Creole Trail Pipeline and related facilities in order to deliver additional domestic natural gas supplies to the Sabine Pass LNG terminal, which was granted by the FERC in an order issued in April 2015 and an order denying rehearing issued in June 2015. These orders are not subject to appellate court review.
In December 2014, the FERC issued an order granting CCL authorization under Section 3 of the NGA to site, construct and operate Trains 1 through 3 of the CCL Project and issued a certificate of public convenience and necessity under Section 7(c) of the NGA authorizing construction and operation of the Corpus Christi Pipeline (the “December 2014 Order”). A party to the proceeding requested a rehearing of the December 2014 Order, and in May 2015, the FERC denied rehearing (the “Order Denying Rehearing”). The party petitioned the relevant Court of Appeals to review the December 2014 Order and the Order Denying

12




Rehearing; that petition was denied on November 4, 2016. In June of 2018, CCL Stage III, CCL and CCP filed an application with the FERC for authorization under section 3 of the NGA to site, construct and operate additional facilities for the liquefaction and export of domestically-produced natural gas (“Corpus Christi Stage 3”) at the existing CCL Project. In November 2019, the FERC authorized CCP to construct and operate the pipeline for Corpus Christi Stage 3. Corpus Christi Stage 3 consists of the addition of seven midscale Trains and related facilities. The order is not subject to appellate court review.

On September 27, 2019, CCL and SPL filed a request with the FERC pursuant to section 3 of the NGA, requesting authorization to increase the total LNG production capacity of each terminal from currently authorized levels to an amount which reflects more accurately the capacity of each facility based on enhancements during the engineering, design and construction process, as well as operational experience to date. The requested authorizations do not involve construction of new facilities. Corresponding applications for authorization to export the incremental volumes were also submitted to the DOE.

The FERC’s Standards of Conduct apply to interstate pipelines that conduct transmission transactions with an affiliate that engages in natural gas marketing functions. The general principles of the FERC Standards of Conduct are: (1) independent functioning, which requires transmission function employees to function independently of marketing function employees; (2) no-conduit rule, which prohibits passing transmission function information to marketing function employees; and (3) transparency, which imposes posting requirements to detect undue preference due to the improper disclosure of non-public transmission function information. We have established the required policies, procedures and training to comply with the FERC’s Standards of Conduct.

All of our FERC construction, operation, reporting, accounting and other regulated activities are subject to audit by the FERC, which may conduct routine or special inspections and issue data requests designed to ensure compliance with FERC rules, regulations, policies and procedures. The FERC’s jurisdiction under the NGA allows it to impose civil and criminal penalties for any violations of the NGA and any rules, regulations or orders of the FERC up to approximately $1.3 million per day per violation, including any conduct that violates the NGA’s prohibition against market manipulation.

Several other material governmental and regulatory approvals and permits will be required throughout the life of our LNG terminals and our pipelines. In addition, our FERC orders require us to comply with certain ongoing conditions, reporting obligations and maintain other regulatory agency approvals throughout the life of our facilities. For example, throughout the life of our LNG terminals and our pipelines, we are subject to regular reporting requirements to the FERC, the Department of Transportation’s (“DOT”) Pipeline and Hazardous Materials Safety Administration (“PHMSA”) and applicable federal and state regulatory agencies regarding the operation and maintenance of our facilities. To date, we have been able to obtain and maintain required approvals as needed, and the need for these approvals and reporting obligations have not materially affected our construction or operations.

DOE Export License

The DOE has authorized the export of domestically produced LNG by vessel from the Sabine Pass LNG terminal as discussed in Sabine Pass LNG TerminalLiquefaction Facilities and the Corpus Christi LNG terminal as discussed in Corpus Christi LNG TerminalLiquefaction Facilities. Although it is not expected to occur, the loss of an export authorization could be a force majeure event under our SPAs.

Under Section 3 of the NGA applications for exports of natural gas to FTA countries, which allow for national treatment for trade in natural gas, are “deemed to be consistent with the public interest” and shall be granted by the DOE without “modification or delay.” FTA countries currently recognized by the DOE for exports of LNG include Australia, Bahrain, Canada, Chile, Colombia, Dominican Republic, El Salvador, Guatemala, Jordan, Mexico, Morocco, Nicaragua, Oman, Panama, Peru, Republic of Korea and Singapore. Applications for export of LNG to non-FTA countries are considered by the DOE in a notice and comment proceeding whereby the public and other interveners are provided the opportunity to comment and may assert that such authorization would not be consistent with the public interest.
Pipeline and Hazardous Materials Safety Administration

Our LNG terminals as well as the Creole Trail Pipeline and the Corpus Christi Pipeline are subject to regulation by PHMSA. PHMSA is authorized by the applicable pipeline safety laws to establish minimum safety standards for certain pipelines and LNG facilities. The regulatory standards PHMSA has established are applicable to the design, installation, testing, construction, operation, maintenance and management of natural gas and hazardous liquid pipeline facilities and LNG facilities that affect interstate or foreign commerce. PHMSA has also established training, worker qualification and reporting requirements.


13




In October 2019, PHMSA published final rules revising its regulations governing the safety of certain gas transmission pipelines (effective July 1, 2020) and established new enforcement procedures for the issuance of temporary emergency orders (effective December 2, 2019).

PHMSA performs inspections of pipeline and LNG facilities and has authority to undertake enforcement actions, including issuance of civil penalties up to approximately $218,000 per day per violation, with a maximum administrative civil penalty of approximately $2 million for any related series of violations.

Other Governmental Permits, Approvals and Authorizations

Construction and operation of the Sabine Pass LNG terminal and the CCL Project require additional permits, orders, approvals and consultations to be issued by various federal and state agencies, including the DOT, U.S. Army Corps of Engineers (“USACE”), U.S. Department of Commerce, National Marine Fisheries Services, U.S. Department of the Interior, U.S. Fish and Wildlife Service, the U.S. Environmental Protection Agency (the “EPA”), U.S. Department of Homeland Security, the LDEQ, the Texas Commission on Environmental Quality (“TCEQ”) and the Railroad Commission of Texas (“RRC”).

The USACE issues its permits under the authority of the Clean Water Act (Section 404) and the Rivers and Harbors Act (Section 10) (the “Section 10/404 Permit”). The EPA administers the Clean Air Act, and has delegated authority to the TCEQ and LDEQ to issue the Title V Operating Permit (the “Title V Permit”) and the Prevention of Significant Deterioration Permit (the “PSD Permit”). These two permits are issued by the LDEQ for the Sabine Pass LNG terminal and CTPL and by the TCEQ for the CCL Project.

Commodity Futures Trading Commission (“CFTC”)

The Dodd-Frank Wall Street Reform and Consumer Protection Act (the “Dodd-Frank Act”) amended the Commodity Exchange Act to provide for federal regulation of the over-the-counter derivatives market and entities, such as us, that participate in that market. The regulatory regime created by the Dodd-Frank Act is designed primarily to (1) regulate certain participants in the swaps markets, including entities falling within the categories of “Swap Dealer” and “Major Swap Participant,” (2) require clearing and exchange trading of standardized swaps of certain classes as designated by the CFTC, (3) increase swap market transparency through robust reporting and recordkeeping requirements, (4) reduce financial risks in the derivatives market by imposing margin or collateral requirements on both cleared and, in certain cases, uncleared swaps, (5) provide the CFTC with expanded authority to establish position limits on certain physical commodity futures and options contracts and their economically equivalent swaps as it finds necessary and appropriate and (6) otherwise enhance the rulemaking and enforcement authority of the CFTC and the SEC regarding the derivatives markets. Most of the regulations are already in effect, while other rules and regulations, including the proposed margin rules, position limits and commodity clearing requirements, remain to be finalized or effectuated. Therefore, the impact of those rules and regulations on our business continues to be uncertain.

A provision of the Dodd-Frank Act requires the CFTC, in order to diminish or prevent excessive speculation in commodity markets, to adopt rules, as it finds necessary and appropriate, imposing new position limits on certain physical commodity futures contracts and options thereon, as well as economically equivalent swaps traded on registered swap trading platforms and on over-the-counter swaps that perform a significant price discovery function with respect to certain markets. In that regard, the CFTC has re-proposed position limits rules that would modify and expand the applicability of limits on speculative positions in certain physical commodity futures contracts and economically equivalent futures, options and swaps for or linked to certain physical commodities, including Henry Hub natural gas, that market participants may hold, subject to limited exemptions for certain bona fide hedging and other types of transactions. It is uncertain at this time whether, when and in what form the CFTC’s proposed new position limits rules may become final and effective.

Pursuant to rules adopted by the CFTC, certain interest rate swaps and index credit default swaps must be cleared through a derivatives clearing organization and executed on an exchange or swap execution facility. The CFTC has not yet proposed to designate swaps in any other asset classes, including swaps relating to physical commodities, for mandatory clearing and trade execution, but could do so in the future. Although we expect to qualify for the end-user exception from the mandatory clearing and exchange-trading requirements applicable to any swaps that we enter into to hedge our commercial risks, the mandatory clearing and exchange-trading requirements may apply to other market participants, including our counterparties (who may be registered as Swap Dealers), with respect to other swaps, and the application of such rules may change the market cost and general availability in the market of swaps of the type we enter into to hedge our commercial risks and, thus, the cost and availability of the swaps that we use for hedging.

14




As required by provisions of the Dodd-Frank Act, the CFTC and federal banking regulators have adopted rules to require Swap Dealers and Major Swap Participants, including those that are regulated financial institutions, to collect initial and/or variation margin with respect to uncleared swaps from their counterparties that are financial end users, registered swap dealers or major swap participants. These rules do not require collection of margin from non-financial-entity end users who qualify for the end user exception from the mandatory clearing requirement or from non-financial end users or certain other counterparties in certain instances. We expect to qualify as such a non-financial-entity end user with respect to the swaps that we enter into to hedge our commercial risks.

Any new rules or changes to existing rules promulgated under the Dodd-Frank Act could (1) impair the availability of derivatives, (2) materially increase the cost of, or decrease the liquidity of, the derivatives we use to hedge, (3) significantly alter the terms and conditions of derivatives and (4) potentially increase our exposure to less creditworthy counterparties. Further, any resulting reduction in the use of derivatives could make cash flow more volatile and less predictable, which in turn could adversely affect our ability to plan for and fund capital expenditures.

Pursuant to the Dodd-Frank Act, the CFTC has adopted additional anti-manipulation and anti-disruptive trading practices regulations that prohibit, among other things, manipulative, deceptive or fraudulent schemes or material misrepresentation in the futures, options, swaps and cash markets. In addition, separate from the Dodd-Frank Act, our use of futures and options on commodities is subject to the Commodity Exchange Act and CFTC regulations, as well as the rules of futures exchanges on which any of these instruments are executed. Should we violate any of these laws and regulations, we could be subject to a CFTC or an exchange enforcement action and material penalties, possibly resulting in changes in the rates we can charge.

United Kingdom /European Regulations

Our European Union (“EU”) trading activities, which are primarily established in the United Kingdom (“UK”), are subject to a number of EU-wide and UK specific laws and regulations. These are described further below:

European Market Infrastructure Regulation (“EMIR”)

EMIR is an EU regulation (with text that is relevant across the European Economic Area (“EEA”)) designed to increase the transparency and stability of the EEA derivatives markets, including by: (1) imposing requirements on market participants trading derivatives, including relating to reporting, clearing and risk mitigation; and (2) imposing rules and standards that apply to central counterparties (i.e. clearing houses) and trade repositories. The precise impact of these rules will depend on a number of factors, including the regulatory status of the counterparty that is trading derivative instruments, as well as the volume and types of instruments it is trading. We currently are categorized under EMIR as a non-financial counterparty below the clearing threshold, which is a type of market participant subject to a lower regulatory burden. However, were we to engage in activities that resulted in a change to our status, we could be subject to more onerous regulations (including clearing and margining) which could significantly increase the cost of our derivatives trading activity, and materially alter the terms of the derivatives contracts we enter into.

Regulation on Wholesale Energy Market Integrity and Transparency (“REMIT”)

REMIT is an EU regulation (with EEA relevance) that prohibits market manipulation and insider trading in European wholesale energy markets and imposes various obligations on participants in these markets. Market participants, such as us, cannot use inside information (i.e., non-public information that would likely have a significant effect on the price of wholesale energy products if it were made public) to (1) buy or sell wholesale energy products for their own account or on behalf of a third party, directly or indirectly; (2) induce others to buy or sell wholesale energy products based on inside information; or (3) disclose such inside information to any other person except in the normal course of employment. A market participant is also prohibited from manipulating or attempting to manipulate any wholesale energy market, and is required to publicly disclose inside information which it possesses in respect of business or facilities which it or its affiliates either owns or controls, or for whose operational matters it or they are responsible, either in whole or in part.

Markets in Financial Instruments Directive and Regulation (“MiFID II”)

MiFID II consists of an EU directive, a regulation and a number of delegated acts, rules and guidance, that replaced the original 2004 Markets in Financial Instruments Directive (“MiFID”). MiFID II (with relevance throughout the EEA), sets forth

15




an EEA-wide financial services framework, including rules for firms engaging in investment services and activities in connection with certain financial instruments in the EEA. Firms engaging in such activities must be authorized unless an exemption applies.

We are eligible to trade on our own account in commodity derivatives as a result of the “ancillary activity” exemption under MiFID II. To avail ourselves of this exemption, amongst other things, we must be able to demonstrate, on the basis of a methodology set out in certain delegated MiFID II text, that our activities in commodity derivatives are ancillary to the main business of our group. Provided we meet the requirements, we must notify the UK regulator that we are availing ourselves of this exemption on an annual basis. If, in the future, we are no longer able to meet the requirements of the “ancillary activity” exemption, and no other exemption is available to us, we would be required to become authorized as an investment firm under MiFID II. This may result in us being subject to the regulatory capital requirements under the EU’s Capital Requirements Directive IV.

Market Abuse Regulation (“MAR”)

MAR is intended to update and strengthen the existing EU market abuse framework and applies to all financial instruments listed or traded on EU trading venues as well as other over-the-counter (“OTC”) financial instruments priced on, or impacting, the trading venue contract. Generally, MAR applies to entities trading on, or in a manner that impacts EU markets. MAR contains a number of “insider dealing” and “market manipulation” (including “attempted manipulation”) based offences. Under MAR, any person professionally arranging or executing transactions in financial instruments is required to establish and maintain effective arrangements, systems and procedures to detect and report suspicious orders and transactions.

UK-Specific Rules

In addition to the various EU/EEA rules described above, other UK-specific laws, such as the UK’s Financial Services and Markets Act of 200 (“FSMA”) and Financial Services and Markets Act 2000 (Regulated Activities) Order 2001 (“RAO”), also apply to our trading activities.

Any violation of the foregoing laws and regulations could result in investigations, and possible fine and penalties, and in some scenarios, criminal offenses.

Brexit

The UK withdrew from the EU (“Brexit”) on January 31, 2020, and the withdrawal may have an impact on the applicability of the current EU Regulations and Directives that govern our various trading activities. The precise impacts will depend on the negotiations that will occur during the transition period, which is currently scheduled to end on December 31, 2020, as well as other factors that may or may not be addressed during the negotiations.  We anticipate that impacts could include a possible requirement to register in the EU for certain activities, the possible reclassification of products traded on UK exchanges for EU purposes and products traded on EU exchanges for UK purposes and possible impacts on our treatment related to various regulatory statuses (e.g., clearing threshold classifications and other safe harbors and exemptions).  During this transition period, the UK will continue to be subject to EU Regulations and Rules, with the objective being to provide as smooth a transition as possible for businesses.  Until additional clarity surrounding Brexit is obtained, other impacts pertaining to our trading activities could occur.

Environmental Regulation
  
Our LNG terminals are subject to various federal, state and local laws and regulations relating to the protection of the environment and natural resources. These environmental laws and regulations require significant expenditures for compliance, can affect the cost and output of operations and may impose substantial penalties for non-compliance and substantial liabilities for pollution. Many of these laws and regulations, such as those noted below, restrict or prohibit impacts to the environment or the types, quantities and concentration of substances that can be released into the environment and can lead to substantial administrative, civil and criminal fines and penalties for non-compliance.
 
Clean Air Act (“CAA”)
 
Our LNG terminals are subject to the federal CAA and comparable state and local laws. We may be required to incur certain capital expenditures over the next several years for air pollution control equipment in connection with maintaining or obtaining permits and approvals addressing air emission-related issues. We do not believe, however, that our operations, or the construction and operations of our liquefaction facilities, will be materially and adversely affected by any such requirements.

16




In 2009, the EPA promulgated and finalized the Mandatory Greenhouse Gas Reporting Rule requiring annual reporting of greenhouse gas (“GHG”) emissions from stationary sources in a variety of industries. In 2010, the EPA expanded the rule to include reporting obligations for LNG terminals. In addition, the EPA has defined GHG emissions thresholds that would subject GHG emissions from new and modified industrial sources to regulation if the source is subject to PSD Permit requirements due to its emissions of non-GHG criteria pollutants. While the EPA subsequently took a number of additional actions primarily relating to GHG emissions from the electric power generation and the oil and gas exploration and production industries, those rules have largely been stayed or repealed including by amendments adopted by the EPA on February 23, 2018, additional proposed amendments to new source performance standards for the oil and gas industry on September 24, 2019, and the EPA’s June 19, 2019 adoption of the Affordable Clean Energy rule for power generation.

From time to time, Congress has considered proposed legislation directed at reducing GHG emissions. In addition, many states have already taken regulatory action to monitor and/or reduce emissions of GHGs, primarily through the development of GHG emission inventories or regional GHG cap and trade programs. It is not possible at this time to predict how future regulations or legislation may address GHG emissions and impact our business. However, future regulations and laws could result in increased compliance costs or additional operating restrictions and could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

Coastal Zone Management Act (“CZMA”)
 
The siting and construction of our LNG terminals within the coastal zone is subject to the requirements of the CZMA. The CZMA is administered by the states (in Louisiana, by the Department of Natural Resources, and in Texas, by the General Land Office). This program is implemented to ensure that impacts to coastal areas are consistent with the intent of the CZMA to manage the coastal areas.

Clean Water Act (“CWA”)
 
Our LNG terminals are subject to the federal CWA and analogous state and local laws. The CWA imposes strict controls on the discharge of pollutants into the navigable waters of the United States, including discharges of wastewater and storm water runoff and fill/discharges into waters of the United States. Permits must be obtained prior to discharging pollutants into state and federal waters. The CWA is administered by the EPA, the USACE and by the states (in Louisiana, by the LDEQ, and in Texas, by the TCEQ).

Resource Conservation and Recovery Act (“RCRA”)
 
The federal RCRA and comparable state statutes govern the generation, handling and disposal of solid and hazardous wastes and require corrective action for releases into the environment. When such wastes are generated in connection with the operations of our facilities, we are subject to regulatory requirements affecting the handling, transportation, treatment, storage and disposal of such wastes.
 
Protection of Species, Habitats and Wetlands

Various federal and state statutes, such as the Endangered Species Act (the “ESA”), the Migratory Bird Treaty Act (“MBTA”), the CWA and the Oil Pollution Act, prohibit certain activities that may adversely affect endangered or threatened animal, fish and plant species and/or their designated habitats, wetlands, or other natural resources. If one of our LNG terminals or pipelines adversely affects a protected species or its habitat, we may be required to develop and follow a plan to avoid those impacts. In that case, siting, construction or operation may be delayed or restricted and cause us to incur increased costs.
In August 2019, the U.S. Fish and Wildlife Service (the “FWS”) announced a series of changes to the rules implementing the ESA, including revisions to the regulations governing interagency cooperation, listing species and delisting critical habitat, and prohibitions related to threatened wildlife and plants. The revisions are intended to streamline these processes and create more flexibility for the FWS when making ESA-related decisions.

In addition, in December 2017, the Department of Interior’s (“DOI’s”) Solicitor’s Office issued an official opinion that the MBTA’s broad prohibition on “taking” migratory birds applies only to affirmative actions and does prohibit incidental harm. In April 2018, the FWS issued guidance consistent with the DOI’s opinion and on January 30, 2020, the FWS issued a proposed rule defining the scope of the MBTA to cover only actions directed at migratory birds, their nests or their eggs.

17




We do not believe that our operations, or the construction and operations of our liquefaction facilities, will be materially and adversely affected by these recent regulatory actions.

Market Factors

Our ability to enter into additional long-term SPAs to underpin the development of additional Trains, sale of LNG by Cheniere Marketing, or development of new projects is subject to market factors. These factors include changes in worldwide supply and demand for natural gas, LNG and substitute products, the relative prices for natural gas, crude oil and substitute products in North America and international markets, the rate of fuel switching for power generation from coal, nuclear or oil to natural gas and economic growth in developing countries. In addition, our ability to obtain additional funding to execute our business strategy is subject to the investment community’s appetite for investment in LNG and natural gas infrastructure and our ability to access capital markets.

We expect that global demand for natural gas and LNG will continue to increase as nations seek more abundant, reliable and environmentally cleaner fuel alternatives to oil and coal.  Global demand for natural gas is projected by the International Energy Agency to grow by approximately 27 trillion cubic feet (“Tcf”) between 2018 and 2030 and 39 Tcf between 2018 and 2035. LNG’s share is seen growing from about 11% in 2018 to about 16% of the global gas market in 2030 and 18% in 2035.  Wood Mackenzie Limited (“WoodMac”) forecasts that global demand for LNG will increase by approximately 79%, from approximately 316 mtpa, or 15.2 Tcf, in 2018, to approximately 566 mtpa, or 27.2 Tcf, in 2030 and to 678 mtpa or 32.6 Tcf in 2035. WoodMac also forecasts LNG production from existing operational facilities and new facilities already under construction will be able to supply the market with approximately 469 mtpa in 2030, declining to 430 mtpa in 2035. This will result in a market need for construction of an additional approximately 97 mtpa of LNG production by 2030 and about 248 mtpa by 2035.  We believe the capital and operating costs of the uncommitted capacity of our Liquefaction Projects and Corpus Christi Stage 3 are competitive with new proposed projects globally and we are well-positioned to capture a portion of this incremental market need.
We have limited exposure to the decline in oil prices as we have contracted a significant portion of our LNG production capacity under long-term sale and purchase agreements. These agreements contain fixed fees that are required to be paid even if the customers elect to cancel or suspend delivery of LNG cargoes.  We have contracted approximately 85% of the total production capacity from the Liquefaction Projects on a term basis, which includes volumes contracted under SPAs in which the customers are required to pay a fixed fee with respect to the contracted volumes irrespective of their election to cancel or suspend deliveries of LNG cargoes, as well as volumes contracted under IPM gas supply agreements. As of January 31, 2020, U.S. natural gas prices indicate that LNG exported from the U.S. continues to be competitively priced, supporting the opportunity for U.S. LNG to fill uncontracted future demand through the execution of long-term and medium-term contracting of LNG from our terminals.

Subsidiaries
 
Our assets are generally held by our subsidiaries. We conduct most of our business through these subsidiaries, including the development, construction and operation of our LNG terminal business and the development and operation of our LNG and natural gas marketing business.

Employees
 
We had 1,530 full-time employees at January 31, 2020.  

Available Information

Our common stock has been publicly traded since March 24, 2003 and is traded on the NYSE American under the symbol “LNG.” Our principal executive offices are located at 700 Milam Street, Suite 1900, Houston, Texas 77002, and our telephone number is (713) 375-5000. Our internet address is www.cheniere.com. We provide public access to our annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and amendments to these reports as soon as reasonably practicable after we electronically file those materials with, or furnish those materials to, the SEC under the Exchange Act. These reports may be accessed free of charge through our internet website. We make our website content available for informational purposes only. The website should not be relied upon for investment purposes and is not incorporated by reference into this Form 10-K.


18




We will also make available to any stockholder, without charge, copies of our annual report on Form 10-K as filed with the SEC. For copies of this, or any other filing, please contact: Cheniere Energy, Inc., Investor Relations Department, 700 Milam Street Suite 1900, Houston, Texas 77002 or call (713) 375-5000. The SEC maintains an internet site (www.sec.gov) that contains reports, proxy and information statements and other information regarding issuers.

ITEM 1A.
RISK FACTORS
 
The following are some of the important factors that could affect our financial performance or could cause actual results to differ materially from estimates or expectations contained in our forward-looking statements. We may encounter risks in addition to those described below. Additional risks and uncertainties not currently known to us, or that we currently deem to be immaterial, may also impair or adversely affect our business, contracts, financial condition, operating results, cash flows, liquidity and prospects.
The risk factors in this report are grouped into the following categories:
Risks Relating to Our Financial Matters; 
Risks Relating to Our LNG Terminal Operations and Commercialization; 
Risks Relating to Our LNG Business in General; and 
Risks Relating to Our Business in General.

Risks Relating to Our Financial Matters
 
Our existing level of cash resources and significant debt could cause us to have inadequate liquidity and could materially and adversely affect our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
 
As of December 31, 2019, we had $2.5 billion of cash and cash equivalents, $520 million of current restricted cash and $31.5 billion of total debt outstanding on a consolidated basis (before unamortized premium, discount and debt issuance costs), excluding $1.5 billion aggregate outstanding letters of credit. We incur, and will incur, significant interest expense relating to the assets at the Sabine Pass and Corpus Christi LNG terminals, and we anticipate needing to incur additional debt to finance the construction of Corpus Christi Stage 3. Our ability to fund our capital expenditures and refinance our indebtedness will depend on our ability to access additional project financing as well as the debt and equity capital markets. A variety of factors beyond our control could impact the availability or cost of capital, including domestic or international economic conditions, increases in key benchmark interest rates and/or credit spreads, the adoption of new or amended banking or capital market laws or regulations and the repricing of market risks and volatility in capital and financial markets. Our financing costs could increase or future borrowings or equity offerings may be unavailable to us or unsuccessful, which could cause us to be unable to pay or refinance our indebtedness or to fund our other liquidity needs. We also rely on borrowings under our credit facilities to fund our capital expenditures. If any of the lenders in the syndicates backing these facilities was unable to perform on its commitments, we may need to seek replacement financing, which may not be available as needed, or may be available in more limited amounts or on more expensive or otherwise unfavorable terms.

We have not always been profitable historically. We may not achieve profitability or generate positive operating cash flow in the future.
 
We had net loss attributable to common stockholders of $393 million for the year ended December 31, 2017 and had losses in prior years. In the future, we may incur operating losses and experience negative operating cash flow. We may not be able to reduce costs, increase revenues or reduce our debt service obligations sufficiently to maintain our cash resources, which could cause us to have inadequate liquidity to continue our business.

We will continue to incur significant capital and operating expenditures while we develop and construct the Liquefaction Projects, Corpus Christi Stage 3 and other projects. Any delays beyond the expected development period for these projects could cause operating losses and negative operating cash flows. Our future liquidity may also be affected by the timing of construction financing availability in relation to the incurrence of construction costs and other outflows and by the timing of receipt of cash flows under third-party agreements in relation to the incurrence of project and operating expenses. Moreover, many factors (including factors beyond our control) could result in a disparity between liquidity sources and cash needs, including factors such as construction delays and breaches of agreements. Our ability to generate any significant positive operating cash flow and achieve profitability in the future is dependent on our ability to successfully and timely complete and operate the applicable project.


19




We may sell equity or equity-related securities or assets, including equity interests in Cheniere Partners. Such sales could dilute our stockholders’ proportionate indirect interests in our assets, business operations and proposed liquefaction and other projects of Cheniere Partners or other subsidiaries, and could adversely affect the market price of our common stock.
 
We have historically pursued a number of alternatives in order to finance the construction of our Trains, including potential issuances and sales of additional equity or equity-related securities by us or Cheniere Partners. Such sales, in one or more transactions, could dilute our stockholders’ proportionate indirect interests in our assets, business operations and proposed projects of Cheniere Partners, including the SPL Project, or in other subsidiaries or projects, including the CCL Project. In addition, such sales, or the anticipation of such sales, could adversely affect the market price of our common stock.

Our stockholders may experience dilution upon the conversion of our convertible notes.

In November 2014, we issued an aggregate principal amount of $1.0 billion Convertible Unsecured Notes due 2021 (the “2021 Cheniere Convertible Unsecured Notes”) to RRJ Capital II Ltd, Baytree Investments (Mauritius) Pte Ltd and Seatown Lionfish Pte. Ltd. In March 2015, we issued $625 million aggregate principal amount of 4.25% Convertible Senior Notes due 2045 (the “2045 Cheniere Convertible Senior Notes”) to certain investors through a registered direct offering. In May 2015, CCH HoldCo II issued $1.0 billion aggregate principal amount of 11.0% Convertible Senior Secured Notes due 2025 (the “2025 CCH HoldCo II Convertible Senior Notes” and together with the 2021 Cheniere Convertible Unsecured Notes and the 2045 Cheniere Convertible Senior Notes, the “Convertible Notes”) to EIG Management Company, LLC.  
We have the option to satisfy the 2021 Cheniere Convertible Unsecured Notes and the 2045 Cheniere Convertible Senior Notes conversion obligations with cash, common stock or a combination thereof. The 2025 CCH HoldCo II Convertible Senior Notes conversion obligations must be satisfied with common stock. The 2021 Cheniere Convertible Unsecured Notes are convertible at an initial conversion price of $93.64. Prior to December 15, 2044, the 2045 Cheniere Convertible Senior Notes will be convertible upon the occurrence of certain conditions, and on and after such date they will become freely convertible. The 2045 Cheniere Convertible Senior Notes will become convertible into the common stock of Cheniere at an initial conversion price of $138.38 per share. Provided the total market capitalization of Cheniere at that time is not less than $10.0 billion and certain other conditions are satisfied, the 2025 CCH HoldCo II Convertible Senior Notes will be convertible at CCH HoldCo II’s option on or after March 1, 2020 (the “Eligible Conversion Date”). The conversion price for 2025 CCH HoldCo II Convertible Senior Notes converted at CCH HoldCo II’s option is the lower of (1) a 10% discount to the average of the daily volume-weighted average price (“VWAP”) of our common stock for the 90 trading day period prior to the date on which notice of conversion is provided and (2) a 10% discount to the closing price of our common stock on the trading day preceding the date on which notice of conversion is provided. At the option of the holders, the 2025 CCH HoldCo II Convertible Senior Notes are convertible on or after the six-month anniversary of the Eligible Conversion Date, provided the total market capitalization of Cheniere at that time is not less than $10.0 billion and certain other conditions are satisfied, at a conversion price equal to the average of the daily VWAP of our common stock for the 90 trading day period prior to the date on which notice of conversion is provided.

The conversion of some or all of the Convertible Notes into shares of our common stock will dilute the ownership percentages and voting power of our existing stockholders.  Based on the initial conversion price, if we elect to satisfy the entire conversion obligations of the 2021 Cheniere Convertible Unsecured Notes and the 2045 Cheniere Convertible Senior Notes with common stock, an aggregate of approximately 19.1 million shares of our common stock would be issued upon the conversion, assuming the notes are converted at maturity and all interest on the notes is paid in kind for the 2021 Cheniere Convertible Unsecured Notes. Because the conversion rate for the 2025 CCH HoldCo II Convertible Senior Notes will depend on the price of our common stock at the time of conversion, we cannot meaningfully estimate the number of shares of our common stock, if any, that would be issued upon the conversion of such notes; however, under these convertible notes, a maximum of 47,108,466 shares of our common stock (subject to adjustment in the event of a stock split) may be issued in the aggregate upon the conversion of all of the 2025 CCH HoldCo II Convertible Senior Notes.  Any sales in the public market of the shares issuable upon conversion of the Convertible Notes could adversely affect the prevailing market prices of our common stock.  In addition, the existence of the Convertible Notes may encourage short selling by market participants because the conversion of the Convertible Notes could be used to satisfy short positions, or the anticipated conversion of the Convertible Notes into shares of our common stock could depress the price of our common stock.


20




Our ability to generate cash is substantially dependent upon the performance by customers under long-term contracts that we have entered into, and we could be materially and adversely affected if any customer fails to perform its contractual obligations for any reason.

Our future results and liquidity are substantially dependent upon performance by our customers to make payments under long-term contracts. As of December 31, 2019, SPL had SPAs with eight third-party customers, CCL had SPAs with nine third-party customers and our integrated marketing function had a limited number of SPAs with third-party customers. In addition, SPLNG had TUAs with two third-party customers. We are dependent on each customer’s continued willingness and ability to perform its obligations under its SPA or TUA. We are exposed to the credit risk of any guarantor of these customers’ obligations under their respective agreements in the event that we must seek recourse under a guaranty. If any customer fails to perform its obligations under its SPA or TUA, our business, contracts, financial condition, operating results, cash flow, liquidity and prospects could be materially and adversely affected, even if we were ultimately successful in seeking damages from that customer or its guarantor for a breach of the agreement.

Each of our customer contracts is subject to termination under certain circumstances.
  
Each of the SPAs contains various termination rights allowing our customers to terminate their SPAs, including, without limitation: (1) upon the occurrence of certain events of force majeure; (2) if we fail to make available specified scheduled cargo quantities; and (3) delays in the commencement of commercial operations. We may not be able to replace these SPAs on desirable terms, or at all, if they are terminated.

Each of SPLNG’s long-term TUAs contains various termination rights. For example, each customer may terminate its TUA if the Sabine Pass LNG terminal experiences a force majeure delay for longer than 18 months, fails to redeliver a specified amount of natural gas in accordance with the customer’s redelivery nominations or fails to accept and unload a specified number of the customer’s proposed LNG cargoes. SPLNG may not be able to replace these TUAs on desirable terms, or at all, if they are terminated.

Our subsidiaries may be restricted under the terms of their indebtedness from making distributions under certain circumstances, which may limit Cheniere Partners’ ability to pay or increase distributions to us or inhibit our access to cash flows from the CCL Project and could materially and adversely affect us.
 
The agreements governing our subsidiaries’ indebtedness restrict payments that our subsidiaries can make to Cheniere Partners or us in certain events and limit the indebtedness that our subsidiaries can incur. For example, SPL is restricted from making distributions under agreements governing its indebtedness generally until, among other requirements, deposits are made into debt service reserve accounts and a debt service coverage ratio of 1.25:1.00 is satisfied.

CCH is generally restricted from making distributions under agreements governing its indebtedness until, among other requirements, the completion of the construction of Trains 1 through 3 of the CCL Project, funding of a debt service reserve account equal to six months of debt service and achieving a historical debt service coverage ratio and fixed projected debt service coverage ratio of at least 1.25:1.00.

CCH HoldCo II is restricted from making distributions to Cheniere under agreements governing its indebtedness generally until, among other requirements, a historical debt service coverage ratio and a projected fixed debt services coverage ratio of 1.20:1.00 are achieved.

Our subsidiaries’ inability to pay distributions to Cheniere Partners or us or to incur additional indebtedness as a result of the foregoing restrictions in the agreements governing their indebtedness may inhibit Cheniere Partners’ ability to pay or increase distributions to us and its other unitholders or inhibit our access to cash flows from the CCL Project, which could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.


21




Restrictions in agreements governing us and our subsidiaries’ indebtedness may prevent us and our subsidiaries from engaging in certain beneficial transactions.
 
In addition to restrictions on the ability of us, Cheniere Partners, SPL, CCH and CCH HoldCo II to make distributions or incur additional indebtedness, the agreements governing our indebtedness also contain various other covenants that may prevent us from engaging in beneficial transactions, including limitations on our ability to:
make certain investments;
purchase, redeem or retire equity interests;
issue preferred stock;
sell or transfer assets;
incur liens;
enter into transactions with affiliates;
consolidate, merge, sell or lease all or substantially all of our assets; and
enter into sale and leaseback transactions.
Our use of hedging arrangements may adversely affect our future operating results or liquidity.

To reduce our exposure to fluctuations in the price, volume and timing risk associated with the purchase of natural gas, we use futures, swaps and option contracts traded or cleared on the Intercontinental Exchange and the New York Mercantile Exchange or over-the-counter options and swaps with other natural gas merchants and financial institutions. Hedging arrangements could expose us to risk of financial loss in some circumstances, including when:
expected supply is less than the amount hedged;
the counterparty to the hedging contract defaults on its contractual obligations; or
there is a change in the expected differential between the underlying price in the hedging agreement and actual prices received.
The use of derivatives also may require the posting of cash collateral with counterparties, which can impact working capital when commodity prices change.
The regulatory and other provisions of the Dodd-Frank Act and the rules adopted thereunder and other regulations, including EMIR and REMIT, could adversely affect our ability to hedge risks associated with our business and our operating results and cash flows.

The provisions of the Dodd-Frank Act and the rules adopted and to be adopted by the CFTC, the SEC and other federal regulators establishing federal regulation of the OTC derivatives market and entities like us that participate in that market may adversely affect our ability to manage certain of our risks on a cost effective basis. Such laws and regulations may also adversely affect our ability to execute our strategies with respect to hedging our exposure to variability in expected future cash flows attributable to the future sale of our LNG inventory and to price risk attributable to future purchases of natural gas to be utilized as fuel to operate our LNG terminals and to secure natural gas feedstock for our liquefaction facilities.

The CFTC has re-proposed position limits rules that would modify and expand the applicability of position limits on the amounts of certain speculative futures contracts, as well as economically equivalent options, futures and swaps for or linked to certain physical commodities, including Henry Hub natural gas, that market participants may hold, subject to limited exemptions for certain bona fide hedging positions and other types of transactions. To the extent the revised CFTC position limits proposal becomes final, our ability to execute our hedging strategies described above could be limited. It is uncertain at this time whether, when and in what form the CFTC’s proposed new position limits rules may become final and effective.

Under the Dodd-Frank Act and the rules adopted thereunder, certain swaps may be required to be cleared through a derivatives clearing organization. While the CFTC has designated certain interest rate swaps and index credit default swaps for mandatory clearing, it has not yet finalized rules designating any physical commodity swaps, for mandatory clearing or mandatory exchange trading. Further, we qualify for the end-user exception from the mandatory clearing and trade execution requirements for our

22




swaps entered into to hedge our commercial risks. If we fail to qualify for that exception as to any swap we enter into and have to clear that swap through a derivatives clearing organization, we could be required to post margin (or post higher margin than if we entered into an uncleared OTC swap) with respect to such swap, our cost of entering into and maintaining such swap could increase and we would not enjoy the same flexibility with the cleared swaps that we enjoy with the uncleared OTC swaps we enter into. Moreover, the application of the mandatory clearing and trade execution requirements to other market participants, such as swap dealers, may change the market cost and general availability in the market of swaps of the type we enter into to hedge our commercial risks and, thus, the cost and availability of the swaps that we use for hedging.

As required by the Dodd-Frank Act, the CFTC and federal banking regulators have adopted rules to require certain market participants to collect and post initial and/or variation margin with respect to uncleared swaps from their counterparties that are financial end users and certain registered swap dealers and major swap participants. Although we believe we will not be required to post margin with respect to any uncleared swaps we enter into in the future, were we required to post margin as to our uncleared swaps in the future, our cost of entering into and maintaining swaps would be increased. Our counterparties that are subject to the regulations imposing the Basel III capital requirements on them may increase the cost to us of entering into swaps with them or, although not required to collect margin from us under the margin rules, contractually require us to post collateral with them in connection with such swaps in order to offset their increased capital costs or to reduce their capital costs to maintain those swaps on their balance sheets.

The Dodd-Frank Act also imposes other regulatory requirements on swaps market participants, including end users of swaps, such as regulations relating to swap documentation, reporting and recordkeeping, and certain business conduct rules applicable to swap dealers and major swap participants. Together with the Basel III capital requirements on certain swaps market participants, the regulatory requirements of the Dodd-Frank Act and the rules thereunder relating to swaps and derivatives market participants could significantly increase the cost of derivative contracts (including through requirements to post margin or collateral), materially alter the terms of derivative contracts, reduce the availability of derivatives to protect against certain risks that we encounter and reduce our ability to monetize or restructure our existing derivative contracts and to execute our hedging strategies. If, as a result of the swaps regulatory regime discussed above, we were to reduce our use of swaps to hedge our risks, such as commodity price risks that we encounter in our operations, our operating results and cash flows may become more volatile and could be otherwise adversely affected.

The Federal Reserve Board also has proposed rules that would limit certain physical commodity activities of financial holding companies. Such rules, if adopted, may adversely affect our ability to execute our strategies by restricting our available counterparties for certain types of transactions, limiting our ability to obtain certain services, and reducing liquidity in physical and financial markets. It is uncertain at this time whether, when and in what form the Federal Reserve’s proposed rules regarding financial holding companies may become final and effective.
European and UK-specific regulations, including but not limited to EMIR, MiFID II, REMIT, MAR, FSMA and RAO, govern our trading activities and our compliance with such laws may result in increased costs and risks to the business similar to the impacts stated above with respect to the Dodd-Frank Act. The increased costs may also have an adverse impact on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects. Further, any violation of the foregoing laws and regulations could result in investigations, and possible fines and penalties, and in some scenarios, criminal offenses.

Further, given the current lack of clarity relating to how UK and EU financial and commodity market regulatory regimes will interact following the UK’s withdrawal from the EU on January 31, 2020, including the impact such withdrawal will have on parties subject to the referenced regulations, additional regulatory risks may result.  However, until negotiations between the UK and EU are completed during the transition period, which is currently scheduled to expire on December 31, 2020, it is impossible at this point to address with certainty the impact of Brexit on our operations.

We expect that our hedging activities will remain subject to significant and developing regulations and regulatory oversight. However, the full impact of the various U.S. (and non-U.S.) regulatory developments in connection with these activities will not be known with certainty until such derivatives market regulations are fully implemented and related market practices and structures are fully developed.


23




Risks Relating to Our LNG Terminal Operations and Commercialization
 
Operation of the Sabine Pass LNG terminal, the Liquefaction Projects, our pipelines and other facilities that we may construct involves significant risks.
 
As more fully discussed in these Risk Factors, the Sabine Pass LNG terminal, the Liquefaction Projects, our pipelines and our other existing and proposed LNG facilities face operational risks, including the following:
the facilities’ performing below expected levels of efficiency;
breakdown or failures of equipment;
operational errors by vessel or tug operators;
operational errors by us or any contracted facility operator;
labor disputes; and
weather-related interruptions of operations.

Cost overruns and delays in the completion of one or more Trains, as well as difficulties in obtaining sufficient financing to pay for such costs and delays, could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
 
The actual construction costs of the Trains may be significantly higher than our current estimates as a result of many factors, including change orders under existing or future EPC contracts resulting from the occurrence of certain specified events that may give Bechtel the right to cause us to enter into change orders or resulting from changes with which we otherwise agree. We have already experienced increased costs due to change orders. As construction progresses, we may decide or be forced to submit change orders to our contractor that could result in longer construction periods, higher construction costs or both, including change orders to comply with existing or future environmental or other regulations.

Delays in the construction of one or more Trains beyond the estimated development periods, as well as change orders to the EPC contracts with Bechtel or any future EPC contract related to additional Trains, could increase the cost of completion beyond the amounts that we estimate, which could require us to obtain additional sources of financing to fund our operations until the applicable liquefaction project is fully constructed (which could cause further delays). Our ability to obtain financing that may be needed to provide additional funding to cover increased costs will depend, in part, on factors beyond our control. Accordingly, we may not be able to obtain financing on terms that are acceptable to us, or at all. Even if we are able to obtain financing, we may have to accept terms that are disadvantageous to us or that may have a material adverse effect on our current or future business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

Our ability to complete development of additional Trains will be contingent on our ability to obtain additional funding. If we are unable to obtain sufficient funding, we may be unable to fully execute our business strategy.
 
We will require significant additional funding to be able to commence construction of additional Trains, which we may not be able to obtain at a cost that results in positive economics, or at all. The inability to achieve acceptable funding may cause a delay in the development of additional Trains, and we may not be able to complete our business plan. Even if we are able to obtain funding, the funding may be inadequate to cover any increases in costs or delays in completion of additional Trains, which may cause a delay in the receipt of revenues projected therefrom or cause a loss of one or more future customers in the event of significant delays. As a result, any significant construction delay, whatever the cause, could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

Hurricanes or other disasters could result in an interruption of our operations, a delay in the completion of our liquefaction projects, damage to our liquefaction projects and increased insurance costs, all of which could adversely affect us.
 
Hurricanes Katrina and Rita in 2005, Hurricane Ike in 2008 and Hurricane Harvey in 2017 caused temporary suspension in construction of our liquefaction projects or caused minor damage to our liquefaction projects. Future storms and related storm activity and collateral effects, or other disasters such as explosions, fires, floods or accidents, could result in damage to, or interruption of operations at, the Sabine Pass LNG terminal, the Corpus Christi terminal or related infrastructure, as well as delays or cost increases in the construction and the development of the Liquefaction Projects, Corpus Christi Stage 3 or our other facilities

24




and increase our insurance premiums. The U.S. Global Change Research Program has reported that the U.S.’s energy and transportation systems are expected to be increasingly disrupted by climate change and extreme weather events. An increase in frequency and severity of extreme weather events such as storms, floods, fires and rising sea levels could have an adverse effect on our operations.
 
Failure to obtain and maintain approvals and permits from governmental and regulatory agencies with respect to the design, construction and operation of our facilities, the development and operation of our pipelines and the export of LNG could impede operations and construction and could have a material adverse effect on us.

The design, construction and operation of interstate natural gas pipelines, LNG terminals, including the Liquefaction Projects, Corpus Christi Stage 3 and other facilities, and the import and export of LNG and the purchase and transportation of natural gas, are highly regulated activities. Approvals of the FERC and DOE under Section 3 and Section 7 of the NGA, as well as several other material governmental and regulatory approvals and permits, including several under the CAA and the CWA, are required in order to construct and operate an LNG facility and an interstate natural gas pipeline and export LNG. Although the FERC has issued orders under Section 3 of the NGA authorizing the siting, construction and operation of the six Trains and related facilities of the SPL Project, the three Trains and related facilities of the CCL Project and the seven midscale Trains and related facilities for Corpus Christi Stage 3, as well as orders under Section 7 of the NGA authorizing the construction and operation of the Creole Trail Pipeline, the Corpus Christi Pipeline and the pipeline for Corpus Christi Stage 3, the FERC orders require us to comply with certain ongoing conditions and obtain certain additional approvals in conjunction with ongoing construction and operations of our liquefaction and pipeline facilities. We will be required to obtain similar approvals and permits with respect to any expansion or modification of our liquefaction and pipeline facilities. We cannot control the outcome of the regulatory review and approval processes. Certain of these governmental permits, approvals and authorizations are or may be subject to rehearing requests, appeals and other challenges.

Authorizations obtained from the FERC, DOE and other federal and state regulatory agencies also contain ongoing conditions, and additional approval and permit requirements may be imposed. We do not know whether or when any such approvals or permits can be obtained, or whether any existing or potential interventions or other actions by third parties will interfere with our ability to obtain and maintain such permits or approvals. If we are unable to obtain and maintain the necessary approvals and permits, including as a result of untimely notices or filings, we may not be able to recover our investment in our projects. Additionally, government disruptions, such as a U.S. government shutdown, may delay or halt our ability to obtain and maintain necessary approvals and permits. There is no assurance that we will obtain and maintain these governmental permits, approvals and authorizations, or that we will be able to obtain them on a timely basis, and failure to obtain and maintain any of these permits, approvals or authorizations could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

Delays in the completion of one or more Trains could lead to reduced revenues or termination of one or more of the SPAs by our customers.
 
Any delay in completion of a Train could cause a delay in the receipt of revenues projected therefrom or cause a loss of one or more customers in the event of significant delays. In particular, each of our SPAs provides that the customer may terminate that SPA if the relevant Train does not timely commence commercial operations. As a result, any significant construction delay, whatever the cause, could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

We are dependent on Bechtel and other contractors for the successful completion of the Liquefaction Projects.

Timely and cost-effective completion of the Liquefaction Projects in compliance with agreed specifications is central to our business strategy and is highly dependent on the performance of Bechtel and our other contractors under their agreements. The ability of Bechtel and our other contractors to perform successfully under their agreements is dependent on a number of factors, including their ability to:
design and engineer each Train to operate in accordance with specifications;
engage and retain third-party subcontractors and procure equipment and supplies;
respond to difficulties such as equipment failure, delivery delays, schedule changes and failure to perform by subcontractors, some of which are beyond their control;

25




attract, develop and retain skilled personnel, including engineers;
post required construction bonds and comply with the terms thereof;
manage the construction process generally, including coordinating with other contractors and regulatory agencies; and
maintain their own financial condition, including adequate working capital.
Although some agreements may provide for liquidated damages if the contractor fails to perform in the manner required with respect to certain of its obligations, the events that trigger a requirement to pay liquidated damages may delay or impair the operation of the Liquefaction Projects, and any liquidated damages that we receive may not be sufficient to cover the damages that we suffer as a result of any such delay or impairment. The obligations of Bechtel and our other contractors to pay liquidated damages under their agreements are subject to caps on liability, as set forth therein.

Furthermore, we may have disagreements with our contractors about different elements of the construction process, which could lead to the assertion of rights and remedies under their contracts and increase the cost of the Liquefaction Projects or result in a contractor’s unwillingness to perform further work on the Liquefaction Projects. If any contractor is unable or unwilling to perform according to the negotiated terms and timetable of its respective agreement for any reason or terminates its agreement, we would be required to engage a substitute contractor. This would likely result in significant project delays and increased costs, which could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

If third-party pipelines and other facilities interconnected to our pipelines and facilities are or become unavailable to transport natural gas, this could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
 
We depend upon third-party pipelines and other facilities that provide gas delivery options to our liquefaction facilities and pipelines. If the construction of new or modified pipeline connections is not completed on schedule or any pipeline connection were to become unavailable for current or future volumes of natural gas due to repairs, damage to the facility, lack of capacity or any other reason, our ability to meet our SPA obligations and continue shipping natural gas from producing regions or to end markets could be restricted, thereby reducing our revenues which could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

We may not be able to purchase or receive physical delivery of sufficient natural gas to satisfy our delivery obligations under the SPAs, which could have a material adverse effect on us.

Under the SPAs with our customers, we are required to make available to them a specified amount of LNG at specified times. However, we may not be able to purchase or receive physical delivery of sufficient quantities of natural gas to satisfy those obligations, which may provide affected SPA customers with the right to terminate their SPAs. Our failure to purchase or receive physical delivery of sufficient quantities of natural gas could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
 
Our interstate natural gas pipelines and their FERC gas tariffs are subject to FERC regulation.
 
Our interstate natural gas pipelines are subject to regulation by the FERC under the NGA and the Natural Gas Policy Act of 1978 (the “NGPA”). The FERC regulates the purchase and transportation of natural gas in interstate commerce, including the construction and operation of pipelines, the rates, terms and conditions of service and abandonment of facilities. Under the NGA, the rates charged by our interstate natural gas pipelines must be just and reasonable, and we are prohibited from unduly preferring or unreasonably discriminating against any person with respect to pipeline rates or terms and conditions of service. If we fail to comply with all applicable statutes, rules, regulations and orders, our interstate pipelines could be subject to substantial penalties and fines.
In addition, as a natural gas market participant, should we fail to comply with all applicable FERC-administered statutes, rules, regulations and orders, we could be subject to substantial penalties and fines. Under the EPAct, the FERC has civil penalty authority under the NGA and the NGPA to impose penalties for current violations of up to $1.3 million per day for each violation.
 

26




Pipeline safety integrity programs and repairs may impose significant costs and liabilities on us.
 
The PHMSA requires pipeline operators to develop integrity management programs to comprehensively evaluate certain areas along their pipelines and to take additional measures to protect pipeline segments located in “high consequence areas” where a leak or rupture could potentially do the most harm. As an operator, we are required to:
perform ongoing assessments of pipeline integrity;
identify and characterize applicable threats to pipeline segments that could impact a “high consequence area”;
improve data collection, integration and analysis;
repair and remediate the pipeline as necessary; and
implement preventative and mitigating actions.
We are required to maintain pipeline integrity testing programs that are intended to assess pipeline integrity. Any repair, remediation, preventative or mitigating actions may require significant capital and operating expenditures. Should we fail to comply with applicable statutes and the Office of Pipeline Safety’s rules and related regulations and orders, we could be subject to significant penalties and fines.
 
Any reduction in the capacity of, or the allocations to, interconnecting, third-party pipelines could cause a reduction of volumes transported in our pipelines, which would adversely affect our revenues and cash flow.
 
We are dependent upon third-party pipelines and other facilities to provide delivery options to and from our pipelines. If any pipeline connection were to become unavailable for volumes of natural gas due to repairs, damage to the facility, lack of capacity or any other reason, our ability to continue shipping natural gas to end markets could be restricted, thereby reducing our revenues. Any permanent interruption at any key pipeline interconnect which causes a material reduction in volumes transported on our pipelines could have a material adverse effect on our business, financial condition, operating results, cash flow, liquidity and prospects.
 
Our business could be materially and adversely affected if we lose the right to situate our pipelines on property owned by third parties.
 
We do not own the land on which our pipelines are situated, and we are subject to the possibility of increased costs to retain necessary land use rights. If we were to lose these rights or be required to relocate our pipelines, our business could be materially and adversely affected.

We are relying on estimates for the future capacity ratings and performance capabilities of the Liquefaction Projects, and these estimates may prove to be inaccurate.
    
We are relying on third parties, principally Bechtel, for the design and engineering services underlying our estimates of the future capacity ratings and performance capabilities of the Liquefaction Projects. If any Train, when actually constructed, fails to have the capacity ratings and performance capabilities that we intend, our estimates may not be accurate. Failure of any of our Trains to achieve our intended capacity ratings and performance capabilities could prevent us from achieving the commercial start dates under our SPAs and could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

Any failure to perform by our counterparties under agreements may adversely affect our operating results, liquidity and access to financing.
 
Our integrated marketing function involves our entering into various purchase and sale, hedging and other transactions with numerous third parties (commonly referred to as “counterparties”). In such arrangements, we are exposed to the performance and credit risks of our counterparties, including the risk that one or more counterparties fails to perform its obligation to make deliveries of commodities and/or to make payments. These risks may increase during periods of commodity price volatility. Defaults by suppliers and other counterparties may adversely affect our operating results, liquidity and access to financing.


27




We may not be able to contract with customers to sell LNG produced in excess of the aggregate annual contract quantities committed to SPL’s and CCL’s third-party SPAs.
 
We expect to sell any LNG produced in excess of the aggregate annual contract quantity committed to SPL’s and CCL’s third-party SPAs through our integrated marketing function. We are developing a portfolio of long-, medium- and short-term SPAs to transport and unload commercial LNG cargoes to locations worldwide, which is primarily sourced by LNG produced by the Liquefaction Projects in excess of the contract quantities committed to SPL’s and CCL’s third party SPAs, supplemented by volume procured from other locations worldwide, as needed. Excess LNG from the Liquefaction Projects competes with other sources of LNG that are priced to indices other than Henry Hub, and any collapse in the spread between global LNG prices and the Henry Hub index could impact the ability of our integrated marketing function to profitably sell any such excess LNG. Failure to secure buyers for a sufficient amount of LNG could materially and adversely affect our operating results, cash flows and liquidity.

Risks Relating to Our LNG Businesses in General
 
We may not construct or operate all of our proposed LNG facilities or Trains or any additional LNG facilities or Trains beyond those currently planned, which could limit our growth prospects.

We may not construct some of our proposed LNG facilities or Trains, whether due to lack of commercial interest or inability to obtain financing or otherwise. Our ability to develop additional liquefaction facilities will also depend on the availability and pricing of LNG and natural gas in North America and other places around the world. Competitors may have longer operating histories, more development experience, greater name recognition, larger staffs and substantially greater financial, technical and marketing resources and access to sources of natural gas and LNG than we do. If we are unable or unwilling to construct and operate additional LNG facilities, our prospects for growth will be limited.

Our cost estimates for Trains are subject to change as a result of cost overruns, change orders under existing or future construction contracts, changes in commodity prices (particularly nickel and steel), escalating labor costs and the potential need for additional funds to be expended to maintain construction schedules. In the event we experience cost overruns, delays or both, the amount of funding needed to complete a Train could exceed our available funds and result in our failure to complete such Train and thereby negatively impact our business and limit our growth prospects.

Cyclical or other changes in the demand for and price of LNG and natural gas may adversely affect our LNG business and the performance of our customers and could have a material adverse effect on our business, contracts, financial condition, operating results, cash flows, liquidity and prospects.
 
Our LNG business and the development of domestic LNG facilities and projects generally is based on assumptions about the future availability and price of natural gas and LNG, and the prospects for international natural gas and LNG markets. Natural gas and LNG prices have been, and are likely to continue to be, volatile and subject to wide fluctuations in response to one or more of the following factors:
additions to competitive regasification capacity in North America, Europe, Asia and other markets, which could divert LNG from the Sabine Pass LNG terminal and the Corpus Christi LNG terminal;
competitive liquefaction capacity in North America;
insufficient or oversupply of natural gas liquefaction or receiving capacity worldwide;
insufficient LNG tanker capacity;
weather conditions, including extreme weather events and temperature volatility resulting from climate change;
reduced demand and lower prices for natural gas;
increased natural gas production deliverable by pipelines, which could suppress demand for LNG;
decreased oil and natural gas exploration activities which may decrease the production of natural gas, including as a result of any potential ban on production of natural gas through hydraulic fracturing;
cost improvements that allow competitors to offer LNG regasification services or provide natural gas liquefaction capabilities at reduced prices;

28




changes in supplies of, and prices for, alternative energy sources such as coal, oil, nuclear, hydroelectric, wind and solar energy, which may reduce the demand for natural gas;
changes in regulatory, tax or other governmental policies regarding imported or exported LNG, natural gas or alternative energy sources, which may reduce the demand for imported or exported LNG and/or natural gas;
political conditions in natural gas producing regions;
sudden decreases in demand for LNG as a result of natural disasters or public health crises, including the occurrence of a pandemic, and other catastrophic events;
adverse relative demand for LNG compared to other markets, which may decrease LNG imports into or exports from North America; and
cyclical trends in general business and economic conditions that cause changes in the demand for natural gas.
Adverse trends or developments affecting any of these factors could result in decreases in the price of LNG and/or natural gas, which could materially and adversely affect the performance of our customers, and could have a material adverse effect on our business, contracts, financial condition, operating results, cash flows, liquidity and prospects.

Failure of imported or exported LNG to be a competitive source of energy for the United States or international markets could adversely affect our customers and could materially and adversely affect our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

Operations of the Liquefaction Projects are dependent upon the ability of our SPA customers to deliver LNG supplies from the United States, which is primarily dependent upon LNG being a competitive source of energy internationally. The success of our business plan is dependent, in part, on the extent to which LNG can, for significant periods and in significant volumes, be supplied from North America and delivered to international markets at a lower cost than the cost of alternative energy sources. Through the use of improved exploration technologies, additional sources of natural gas may be discovered outside the United States, which could increase the available supply of natural gas outside the United States and could result in natural gas in those markets being available at a lower cost than LNG exported to those markets.

Although SPL has entered into arrangements to utilize up to approximately three-quarters of the regasification capacity at the Sabine Pass LNG terminal in connection with operations of the SPL Project, operations at the Sabine Pass LNG terminal are dependent, in part, upon the ability of our TUA customers to import LNG supplies into the United States, which is primarily dependent upon LNG being a competitive source of energy in North America. In North America, due mainly to a historically abundant supply of natural gas and discoveries of substantial quantities of unconventional, or shale, natural gas, imported LNG has not developed into a significant energy source. The success of the regasification services component of our business plan is dependent, in part, on the extent to which LNG can, for significant periods and in significant volumes, be produced internationally and delivered to North America at a lower cost than the cost to produce some domestic supplies of natural gas, or other alternative energy sources. Through the use of improved exploration technologies, additional sources of natural gas have recently been and may continue to be discovered in North America, which could further increase the available supply of natural gas and could result in natural gas being available at a lower cost than imported LNG.

Political instability in foreign countries that import or export natural gas, or strained relations between such countries and the United States, may also impede the willingness or ability of LNG purchasers or suppliers and merchants in such countries to import or export LNG from or to the United States. Furthermore, some foreign purchasers or suppliers of LNG may have economic or other reasons to obtain their LNG from, or direct their LNG to, non-U.S. markets or from or to our competitors’ liquefaction or regasification facilities in the United States.

In addition to natural gas, LNG also competes with other sources of energy, including coal, oil, nuclear, hydroelectric, wind and solar energy. LNG from the Liquefaction Projects also competes with other sources of LNG, including LNG that is priced to indices other than Henry Hub. Some of these sources of energy may be available at a lower cost than LNG from the Liquefaction Projects in certain markets. The cost of LNG supplies from the United States, including the Liquefaction Projects, may also be impacted by an increase in natural gas prices in the United States.
 
As a result of these and other factors, LNG may not be a competitive source of energy in the United States or internationally. The failure of LNG to be a competitive supply alternative to local natural gas, oil and other alternative energy sources in markets accessible to our customers could adversely affect the ability of our customers to deliver LNG from the United States or to the

29




United States on a commercial basis. Any significant impediment to the ability to deliver LNG to or from the United States generally, or to the Sabine Pass LNG terminal or the Corpus Christi LNG terminal or from the Liquefaction Projects specifically, could have a material adverse effect on our customers and on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
 
Various economic and political factors could negatively affect the development, construction and operation of LNG facilities, including the Liquefaction Projects and expansion projects, which could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

Commercial development of an LNG facility takes a number of years, requires a substantial capital investment and may be delayed by factors such as:
increased construction costs;
economic downturns, increases in interest rates or other events that may affect the availability of sufficient financing for LNG projects on commercially reasonable terms;
decreases in the price of LNG, which might decrease the expected returns relating to investments in LNG projects;
the inability of project owners or operators to obtain governmental approvals to construct or operate LNG facilities;
political unrest or local community resistance to the siting of LNG facilities due to safety, environmental or security concerns; and
any significant explosion, spill or similar incident involving an LNG facility or LNG vessel.

There may be shortages of LNG vessels worldwide, which could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

The construction and delivery of LNG vessels require significant capital and long construction lead times, and the availability of the vessels could be delayed to the detriment of our business and our customers because of:
an inadequate number of shipyards constructing LNG vessels and a backlog of orders at these shipyards;
political or economic disturbances in the countries where the vessels are being constructed;
changes in governmental regulations or maritime self-regulatory organizations;
work stoppages or other labor disturbances at the shipyards;
bankruptcy or other financial crisis of shipbuilders;
quality or engineering problems;
weather interference or a catastrophic event, such as a major earthquake, tsunami or fire; and
shortages of or delays in the receipt of necessary construction materials.
We may not be able to secure firm pipeline transportation capacity on economic terms that is sufficient to meet our feed gas transportation requirements, which could have a material adverse effect on us.

We have contracted for firm capacity for our natural gas feedstock transportation requirements for the Liquefaction Projects and for Corpus Christi Stage 3.  If and when we need to replace one or more of our existing agreements with these interconnecting pipelines, we may not be able to do so on commercially reasonable terms or at all, which could impair our ability to fulfill our obligations under certain of our SPAs and could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

We face competition based upon the international market price for LNG.
    
Our liquefaction projects are subject to the risk of LNG price competition at times when we need to replace any existing SPA, whether due to natural expiration, default or otherwise, or enter into new SPAs. Factors relating to competition may prevent us from entering into a new or replacement SPA on economically comparable terms as existing SPAs, or at all. Such an event could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and

30




prospects. Factors which may negatively affect potential demand for LNG from our liquefaction projects are diverse and include, among others:
increases in worldwide LNG production capacity and availability of LNG for market supply;
increases in demand for LNG but at levels below those required to maintain current price equilibrium with respect to supply;
increases in the cost to supply natural gas feedstock to our liquefaction projects;
decreases in the cost of competing sources of natural gas or alternate fuels such as coal, heavy fuel oil and diesel;
decreases in the price of non-U.S. LNG, including decreases in price as a result of contracts indexed to lower oil prices;
increases in capacity and utilization of nuclear power and related facilities; and
displacement of LNG by pipeline natural gas or alternate fuels in locations where access to these energy sources is not currently available.
Terrorist attacks, cyber incidents or military campaigns may adversely impact our business.

A terrorist attack, cyber incident or military incident involving an LNG facility, our infrastructure or an LNG vessel may result in delays in, or cancellation of, construction of new LNG facilities, including one or more of the Trains, which would increase our costs and decrease our cash flows. A terrorist incident or cyber incident may also result in temporary or permanent closure of our existing facilities, which could increase our costs and decrease our cash flows, depending on the duration and timing of the closure. Our operations could also become subject to increased governmental scrutiny that may result in additional security measures at a significant incremental cost to us. In addition, the threat of terrorism and the impact of military campaigns may lead to continued volatility in prices for natural gas that could adversely affect our business and our customers, including their ability to satisfy their obligations to us under our commercial agreements. Instability in the financial markets as a result of terrorism, cyber incidents or war could also materially adversely affect our ability to raise capital. The continuation of these developments may subject our construction and our operations to increased risks, as well as increased costs, and, depending on their ultimate magnitude, could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

Risks Relating to Our Business in General
 
We are subject to significant construction and operating hazards and uninsured risks, one or more of which may create significant liabilities and losses for us.

The construction and operation of our LNG terminals and our pipelines are, and will be, subject to the inherent risks associated with these types of operations, including explosions, pollution, release of toxic substances, fires, hurricanes and adverse weather conditions and other hazards, each of which could result in significant delays in commencement or interruptions of operations and/or in damage to or destruction of our facilities or damage to persons and property. In addition, our operations and the facilities and vessels of third parties on which our operations are dependent face possible risks associated with acts of aggression or terrorism.
 
We do not, nor do we intend to, maintain insurance against all of these risks and losses. We may not be able to maintain desired or required insurance in the future at rates that we consider reasonable. The occurrence of a significant event not fully insured or indemnified against could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects. 
 
Existing and future environmental and similar laws and governmental regulations could result in increased compliance costs or additional operating costs or construction costs and restrictions.
    
Our business is and will be subject to extensive federal, state and local laws, rules and regulations applicable to our construction and operation activities relating to, among other things, air quality, water quality, waste management, natural resources and health and safety. Many of these laws and regulations, such as the CAA, the Oil Pollution Act, the CWA and the RCRA, and analogous state laws and regulations, restrict or prohibit the types, quantities and concentration of substances that can be released into the environment in connection with the construction and operation of our facilities, and require us to maintain permits and provide governmental authorities with access to our facilities for inspection and reports related to our compliance. In addition,

31




certain laws and regulations authorize regulators having jurisdiction over the construction and operation of our LNG terminals and pipelines, including FERC and PHMSA, to issue compliance orders, which may restrict or limit operations or increase compliance or operating costs. Violation of these laws and regulations could lead to substantial liabilities, compliance orders, fines and penalties or to capital expenditures that could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects. Federal and state laws impose liability, without regard to fault or the lawfulness of the original conduct, for the release of certain types or quantities of hazardous substances into the environment. As the owner and operator of our facilities, we could be liable for the costs of cleaning up hazardous substances released into the environment at or from our facilities and for resulting damage to natural resources.
    
In 2009, the EPA promulgated and finalized the Mandatory Greenhouse Gas Reporting Rule requiring annual reporting of GHG emissions from stationary sources in a variety of industries. In 2010, the EPA expanded the rule to include reporting obligations for LNG terminals. In addition, the EPA has defined GHG emissions thresholds that would subject GHG emissions from new and modified industrial sources to regulation if the source is subject to PSD Permit requirements due to its emissions of non-GHG criteria pollutants. While the EPA subsequently took a number of additional actions primarily relating to GHG emissions from the electric power generation and the oil and gas exploration and production industries, those rules have largely been stayed or repealed including by amendments adopted by the EPA on February 23, 2018, additional proposed amendments to new source performance standards for the oil and gas industry on September 24, 2019 and the EPA’s June 19, 2019 adoption of the Affordable Clean Energy rule for power generation. However, Congress or a future Administration may reverse these decisions. Other federal and state initiatives may be considered in the future to address GHG emissions through, for example, United States treaty commitments, direct regulation, market-based regulations such as a carbon emissions tax or cap-and-trade programs or clean energy standards. Such initiatives could affect the demand for or cost of natural gas, which we consume at our terminals, or could increase compliance costs for our operations.
    
Other future legislation and regulations, such as those relating to the transportation and security of LNG imported to or exported from our terminals or climate policies of destination countries in relation to their obligations under the Paris Agreement or other national climate change-related policies, could cause additional expenditures, restrictions and delays in our business and to our proposed construction activities, the extent of which cannot be predicted and which may require us to limit substantially, delay or cease operations in some circumstances. Revised, reinterpreted or additional laws and regulations that result in increased compliance costs or additional operating or construction costs and restrictions could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

A major health and safety incident relating to our business could be costly in terms of potential liabilities and reputational damages.

Health and safety performance is critical to the success of all areas of our business. Any failure in health and safety performance may result in personal harm or injury, penalties for non-compliance with relevant regulatory requirements or litigation, and a failure that results in a significant health and safety incident is likely to be costly in terms of potential liabilities. Such a failure could generate public concern and have a corresponding impact on our reputation and our relationships with relevant regulatory agencies and local communities, which in turn could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
 
We may experience increased labor costs, and the unavailability of skilled workers or our failure to attract and retain qualified personnel could adversely affect us. In addition, changes in our senior management or other key personnel could affect our business results.
 
We are dependent upon the available labor pool of skilled employees. We compete with other energy companies and other employers to attract and retain qualified personnel with the technical skills and experience required to construct and operate our facilities and pipelines and to provide our customers with the highest quality service. Our affiliates who hire personnel on our behalf are also subject to the Fair Labor Standards Act, which governs such matters as minimum wage, overtime and other working conditions. A shortage in the labor pool of skilled workers or other general inflationary pressures or changes in applicable laws and regulations could make it more difficult for us to attract and retain qualified personnel and could require an increase in the wage and benefits packages that we offer, thereby increasing our operating costs. Any increase in our operating costs could materially and adversely affect our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
 
We depend on our executive officers for various activities. We do not maintain key person life insurance policies on any of our personnel. Although we have arrangements relating to compensation and benefits with certain of our executive officers,

32




we do not have any employment contracts or other agreements with key personnel other than our employment agreement with our President and Chief Executive Officer binding them to provide services for any particular term. The loss of the services of any of these individuals could have a material adverse effect on our business.
 
Our lack of diversification could have an adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
 
Substantially all of our anticipated revenue in 2020 will be dependent upon our two facilities, the Sabine Pass LNG terminal located in southern Louisiana and the Corpus Christi LNG terminal in Texas. Due to our lack of asset and geographic diversification, an adverse development at the Sabine Pass LNG terminal or the Corpus Christi LNG terminal, including the related pipelines, or in the LNG industry, would have a significantly greater impact on our financial condition and operating results than if we maintained more diverse assets and operating areas.

We may incur impairments to goodwill or long-lived assets.
 
We test our long-lived assets for impairment whenever events or changes in circumstances indicate that the carrying amount of these assets may not be recoverable. We test goodwill for impairment annually during the fourth quarter, or more frequently as circumstances dictate. Significant negative industry or economic trends, including a significant decline in the market price of our common stock, reduced estimates of future cash flows for our business or disruptions to our business could lead to an impairment charge of our long-lived assets, including goodwill. Our valuation methodology for assessing impairment requires management to make judgments and assumptions based on historical experience and to rely heavily on projections of future operating performance. Projections of future operating results and cash flows may vary significantly from results. In addition, if our analysis results in an impairment to our goodwill or long-lived assets, we may be required to record a charge to earnings in our Consolidated Financial Statements during a period in which such impairment is determined to exist, which may negatively impact our operating results.

We cannot guarantee that our share repurchase program will be fully consummated or that it will enhance long-term stockholder value.

In June 2019, our Board authorized a three-year, $1 billion share repurchase program and as of December 31, 2019, up to $751 million remains available for repurchase. Our share repurchase program does not obligate us to acquire any particular amount of common stock. Our share repurchase program may be modified, suspended or terminated at any time, which may result in a decrease in the trading price of our common stock.

The market price of our common stock has fluctuated significantly in the past and is likely to fluctuate in the future. Our stockholders could lose all or part of their investment.

The market price of our common stock has historically experienced and may continue to experience volatility. For example, during the three-year period ended December 31, 2019, the market price of our common stock ranged between $40.36 and $71.03. Such fluctuations may continue as a result of a variety of factors, some of which are beyond our control, including:
domestic and worldwide supply of and demand for natural gas and corresponding fluctuations in the price of natural gas;
fluctuations in our quarterly or annual financial results or those of other companies in our industry;
issuance of additional equity securities which causes further dilution to stockholders;
sales of a high volume of shares of our common stock by our stockholders;
operating and stock price performance of companies that investors deem comparable to us;
events affecting other companies that the market deems comparable to us;
changes in government regulation or proposals applicable to us;
actual or potential non-performance by any customer or a counterparty under any agreement;
announcements made by us or our competitors of significant contracts;
changes in accounting standards, policies, guidance, interpretations or principles;

33




general conditions in the industries in which we operate;
general economic conditions;
the failure of securities analysts to cover our common stock or changes in financial or other estimates by analysts; and
other factors described in these “Risk Factors.”

In addition, the United States securities markets have experienced significant price and volume fluctuations. These fluctuations have often been unrelated to the operating performance of companies in these markets. Market fluctuations and broad market, economic and industry factors may negatively affect the price of our common stock, regardless of our operating performance. If we were to be the object of securities class litigation as a result of volatility in our common stock price or for other reasons, it could result in substantial diversion of our management’s attention and resources, which could negatively affect our financial results.

ITEM 1B.
UNRESOLVED STAFF COMMENTS
 
None.

ITEM 3.    LEGAL PROCEEDINGS

We may in the future be involved as a party to various legal proceedings, which are incidental to the ordinary course of business. We regularly analyze current information and, as necessary, provide accruals for probable liabilities on the eventual disposition of these matters.

LDEQ Matter

Certain of our subsidiaries are in discussions with the LDEQ to resolve self-reported deviations arising from operation of the Sabine Pass LNG terminal and the commissioning of the SPL Project, and relating to certain requirements under its Title V Permit. The matter involves deviations self-reported to LDEQ pursuant to the Title V Permit and covering the time period from January 1, 2012 through March 25, 2016. On April 11, 2016, certain of our subsidiaries received a Consolidated Compliance Order and Notice of Potential Penalty (the “Compliance Order”) from LDEQ covering deviations self-reported during that time period. Certain of our subsidiaries continue to work with LDEQ to resolve the matters identified in the Compliance Order. We do not expect that any ultimate sanction will have a material adverse impact on our financial results.

PHMSA Matter

In February 2018, the PHMSA issued a Corrective Action Order (the “CAO”) to SPL in connection with a minor LNG leak from one tank and minor vapor release from a second tank at the Sabine Pass LNG terminal. These two tanks have been taken out of operational service while we conduct analysis, repair and remediation. On April 20, 2018, SPL and PHMSA executed a Consent Agreement and Order (the “Consent Order”) that replaces and supersedes the CAO. On July 9, 2019, PHMSA and FERC issued a joint letter setting out operating conditions required to be met prior to SPL returning the tanks to service. We continue to coordinate with PHMSA and FERC to address the matters relating to the February 2018 leak, including repair approach and related analysis. We do not expect that the Consent Order and related analysis, repair and remediation will have a material adverse impact on our financial results or operations.

Parallax and Related Litigation

In 2015, our wholly owned subsidiary Cheniere LNG Terminals, LLC (“CLNGT”), entered into discussions with Parallax Enterprises, LLC (“Parallax Enterprises”) regarding the potential joint development of two liquefaction plants in Louisiana (the “Potential Liquefaction Transactions”). While the parties negotiated regarding the Potential Liquefaction Transactions, CLNGT loaned Parallax Enterprises approximately $46 million, as reflected in a secured note dated April 23, 2015, as amended on June 30, 2015, September 30, 2015 and November 4, 2015 (the “Secured Note”). The Secured Note was secured by all assets of Parallax Enterprises and its subsidiary entities. On June 30, 2015, Parallax Enterprises’ parent entity, Parallax Energy LLC (“Parallax Energy”), executed a Pledge and Guarantee Agreement further securing repayment of the Secured Note by providing a parent guaranty and a pledge of all of the equity of Parallax Enterprises in satisfaction of the Secured Note (the “Pledge Agreement”). CLNGT and Parallax Enterprises never executed a definitive agreement to pursue the Potential Liquefaction Transactions. The

34


Secured Note matured on December 11, 2015, and Parallax Enterprises failed to make payment. On February 3, 2016, CLNGT filed an action against Parallax Energy, Parallax Enterprises and certain of Parallax Enterprises’ subsidiary entities, styled Cause No. 4:16-cv-00286, Cheniere LNG Terminals, LLC v. Parallax Energy LLC, et al., in the United States District Court for the Southern District of Texas (the “Texas Federal Suit”). CLNGT asserted claims in the Texas Federal Suit for (1) recovery of all amounts due under the Secured Note and (2) declaratory relief establishing that CLNGT is entitled to enforce its rights under the Secured Note and Pledge Agreement in accordance with each instrument’s terms and that CLNGT has no obligations of any sort to Parallax Enterprises concerning the Potential Liquefaction Transactions. On March 11, 2016, Parallax Enterprises and the other defendants in the Texas Federal Suit moved to dismiss the suit for lack of subject matter jurisdiction. On August 2, 2016, the court denied the defendants’ motion to dismiss without prejudice and permitted the parties to pursue jurisdictional discovery.

On March 11, 2016, Parallax Enterprises filed a suit against us and CLNGT styled Civil Action No. 62-810, Parallax Enterprises LLP v. Cheniere Energy, Inc. and Cheniere LNG Terminals, LLC, in the 25th Judicial District Court of Plaquemines Parish, Louisiana (the “Louisiana Suit”), wherein Parallax Enterprises asserted claims for breach of contract, fraudulent inducement, negligent misrepresentation, detrimental reliance, unjust enrichment and violation of the Louisiana Unfair Trade Practices Act. Parallax Enterprises predicated its claims in the Louisiana Suit on an allegation that we and CLNGT breached a purported agreement to jointly develop the Potential Liquefaction Transactions. Parallax Enterprises sought $400 million in alleged economic damages and rescission of the Secured Note. On April 15, 2016, we and CLNGT removed the Louisiana Suit to the United States District Court for the Eastern District of Louisiana, which subsequently transferred the Louisiana Suit to the United States District Court for the Southern District of Texas, where it was assigned Civil Action No. 4:16-cv-01628 and transferred to the same judge presiding over the Texas Federal Suit for coordinated handling. On August 22, 2016, Parallax Enterprises voluntarily dismissed all claims asserted against CLNGT and us in the Louisiana Suit without prejudice to refiling.

On July 27, 2017, the Parallax entities named as defendants in the Texas Federal Suit reurged their motion to dismiss and simultaneously filed counterclaims against CLNGT and third party claims against us for breach of contract, breach of fiduciary duty, promissory estoppel, quantum meruit and fraudulent inducement of the Secured Note and Pledge Agreement, based on substantially the same factual allegations Parallax Enterprises made in the Louisiana Suit. These Parallax entities also simultaneously filed an action styled Cause No. 2017-49685, Parallax Enterprises, LLC, et al. v. Cheniere Energy, Inc., et al., in the 61st District Court of Harris County, Texas (the “Texas State Suit”), which asserts substantially the same claims these entities asserted in the Texas Federal Suit. On July 31, 2017, CLNGT withdrew its opposition to the dismissal of the Texas Federal Suit without prejudice on jurisdictional grounds and the federal court subsequently dismissed the Texas Federal Suit without prejudice. We and CLNGT simultaneously filed an answer and counterclaims in the Texas State Suit, asserting the same claims CLNGT had previously asserted in the Texas Federal Suit. Additionally, CLNGT filed third party claims against Parallax principals Martin Houston, Christopher Bowen Daniels, Howard Candelet and Mark Evans, as well as Tellurian Investments, Inc., Driftwood LNG, LLC, Driftwood LNG Pipeline LLC and Tellurian Services LLC, formerly known as Parallax Services LLC, including claims for tortious interference with CLNGT’s collateral rights under the Secured Note and Pledge Agreement, fraudulent transfer, conspiracy/aiding and abetting.
 
On February 15, 2019, we filed an action with CLNGT against Charif Souki, our former Chairman of the Board and Chief Executive Officer, styled, Cause No. 2019-11529, Cheniere Energy, Inc. and Cheniere LNG Terminals, LLC v. Charif Souki, in the 55th District Court of Harris County, Texas, which asserts claims of breach of fiduciary duties, fraudulent transfer, tortious interference with CLNGT’s collateral rights under the Secured Note and Pledge Agreement, and conspiracy/aiding and abetting. On April 29, 2019, the court consolidated the Souki matter with the earlier filed pending case against Parallax, Tellurian and the individual defendants in the Texas State Suit.

On January 30, 2020, the parties filed an Agreed Motion to Dismiss and all claims were dismissed with prejudice.

The resolution of the foregoing litigation did not have a material adverse impact on our financial results.

On January 10, 2020, a purported shareholder of Cheniere filed a shareholder derivative action in state court in Houston, Texas. The complaint names as defendants ten of our current directors. The plaintiff alleges that those directors breached their fiduciary duties by abandoning a proposed joint-development arrangement with Parallax in 2015, which later was the subject of a separate lawsuit by Parallax discussed above. According to the complaint, the directors’ alleged breach of their fiduciary duties caused us to incur legal fees in the Parallax action and also exposed us to a potential damages award in the Parallax lawsuit. On January 30, 2020, Parallax voluntarily dismissed with prejudice all claims against us. We do not expect that the resolution of the foregoing litigation will have a material adverse impact on our financial results.


35




ITEM 4.
MINE SAFETY DISCLOSURE

Not applicable.






PART II

ITEM 5.
MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

Market Information, Holders and Dividends
 
Our common stock has traded on the NYSE American under the symbol “LNG” since March 24, 2003. As of February 19, 2020, we had 254 million shares of common stock outstanding held by 96 record owners.
 
We have never paid a cash dividend on our common stock. Any future change in our dividend policy will be made at the discretion of our Board of Directors (our “Board”) in light of our financial condition, capital requirements, earnings, prospects and any restrictions under any financing agreements, as well as other factors our Board deems relevant.

Purchase of Equity Securities by the Issuer and Affiliated Purchasers

The following table summarizes stock repurchases for the three months ended December 31, 2019:
Period
 
Total Number of Shares Purchased (1)
 
Average Price Paid Per Share (2)
 
Total Number of Shares Purchased as a Part of Publicly Announced Plans
 
Approximate Dollar Value of Shares That May Yet Be Purchased Under the Plans (3)
October 1 - 31, 2019
 
324,138
 
$62.15
 
322,000
 
$820,860,569
November 1 - 30, 2019
 
372,766
 
$60.98
 
372,400
 
$798,153,446
December 1 - 31, 2019
 
784,815
 
$60.33
 
783,700
 
$750,875,707
Total
 
1,481,719
 
$60.89
 
1,478,100
 
 
 
(1)
Includes shares surrendered to us by participants in our share-based compensation plans for payment of applicable tax withholdings on the vesting of share-based compensation awards. Associated shares surrendered by participants are repurchased pursuant to terms of the plan and award agreements and not as part of the publicly announced share repurchase plan.
(2)
The price paid per share was based on the average trading price of our common stock on the dates on which we repurchased the shares.
(3)
On June 3, 2019, we announced that our Board authorized a 3-year, $1 billion share repurchase program. For additional information, see Note 18—Share Repurchase Program of our Notes to Consolidated Financial Statements under Item 8 of this Form 10-K.


37


Total Stockholder Return
 
The following is a customized peer group consisting of 27 companies (the “New Peer Group”) that were selected because they are publicly traded companies that have: (1) comparable Global Industries Classification Standards, (2) similar market capitalization, (3) similar enterprise values and (4) similar operating characteristics and capital intensity:
New Peer Group
Air Products and Chemicals, Inc. (APD)
 
LyondellBasell Industries N.V. (LYB)
Apache Corporation (APA)
 
Marathon Oil Corporation (MRO)
Baker Hughes Company (BKR)
 
Marathon Petroleum Corporation (MPC)
Concho Resources Inc. (CXO)
 
Noble Energy, Inc. (NBL)
ConocoPhillips (COP)
 
Occidental Petroleum Corporation (OXY)
Continental Resources, Inc. (CLR)
 
ONEOK, Inc. (OKE)
Devon Energy Corporation (DVN)
 
Phillips 66 (PSX)
Diamondback Energy, Inc. (FANG)
 
Pioneer Natural Resources Company (PXD)
Enterprise Products Partners L.P. (EPD)
 
Schlumberger Limited (SLB)
EOG Resources, Inc. (EOG)
 
Suncor Energy Inc. (SU)
Freeport-McMoRan Inc. (FCX)
 
Targa Resources Corp. (TRGP)
Halliburton Company (HAL)
 
Valero Energy Corporation (VLO)
Hess Corporation (HES)
 
The Williams Companies, Inc. (WMB)
Kinder Morgan, Inc. (KMI)
 
 

The New Peer Group companies were revised during 2019. Our previous peer group consisted of 29 companies (the “Old Peer Group”), which excluded Diamondback Energy, Inc. (FANG) and Targa Resources Corp. (TRGP) from the New Peer Group and included Anadarko Petroleum Corporation (APC), Andeavor (ANDV), EQT Corporation (EQT) and Praxair, Inc. (PX). Additionally, Baker Hughes, a GE company (BHGE) changed its name and ticker symbol to Baker Hughes Company (BKR) in October 2019.

The following graph compares the five-year total return on our common stock, the S&P 500 Index, the New Peer Group and the Old Peer Group. The graph was constructed on the assumption that $100 was invested in our common stock, the S&P 500 Index, the New Peer Group and the Old Peer Group on December 31, 2014 and that any dividends were fully reinvested.
Company / Index
 
2014
 
2015
 
2016
 
2017
 
2018
 
2019
Cheniere Energy, Inc.
 
100.00

 
52.91

 
58.85

 
76.48

 
84.08

 
86.75

S&P 500 Index
 
100.00