Delaware | 001-16383 | 95-4352386 |
(State or other jurisdiction of incorporation or organization) | (Commission File Number) | (I.R.S. Employer Identification No.) |
700 Milam Street, Suite 1900 | ||
Houston, Texas | 77002 | |
(Address of principal executive offices) | (Zip code) |
Large accelerated filer x | Accelerated filer o | |||||
Non-accelerated filer o | Smaller reporting company o | |||||
(Do not check if a smaller reporting company) |
CHENIERE ENERGY, INC. | |||
Date: | November 9, 2015 | By: | /s/ Michael J. Wortley |
Michael J. Wortley | |||
Senior Vice President and Chief Financial Officer | |||
(on behalf of the registrant and as principal financial officer) | |||
Date: | November 9, 2015 | By: | /s/ Leonard Travis |
Leonard Travis | |||
Vice President and Chief Accounting Officer | |||
(on behalf of the registrant and as principal accounting officer) |
Exhibit No. | Description | |
10.1 | Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 2 Liquefaction Facility, dated as of December 20, 2012, between Sabine Pass Liquefaction, LLC and Bechtel Oil, Gas and Chemicals, Inc.: the Change Order CO-00019 East Meter Piping Tie-ins, dated August 26, 2015 (Incorporated by reference to Exhibit 10.1 to Sabine Pass Liquefaction, LLC’s Quarterly Report on Form 10-Q (SEC File No. 333-192373), filed on October 30, 2015) | |
10.2 | Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 3 Liquefaction Facility, dated as of May 4, 2015, between Sabine Pass Liquefaction, LLC and Bechtel Oil, Gas and Chemicals, Inc.: the Change Order CO-00002 Credit to EPC Contract Value for TSA Work, dated September 17, 2015 (Incorporated by reference to Exhibit 10.2 to Sabine Pass Liquefaction, LLC’s Quarterly Report on Form 10-Q (SEC File No. 333-192373), filed on October 30, 2015) | |
10.3 | Amended and Restated Senior Working Capital Revolving Credit and Letter of Credit Reimbursement Agreement, dated as of September 4, 2015, among Sabine Pass Liquefaction, LLC, as Borrower, The Bank of Nova Scotia, as Senior Issuing Bank and Senior Facility Agent, ABN Amro Capital USA LLC, HSBC Bank USA, National Association and ING Capital LLC, as Senior Issuing Banks, Société Générale, as Swing Line Lender, Société Générale, as the Common Security Trustee, and the senior lenders party thereto from time to time and for the benefit of HSBC Bank USA, National Association, ING Capital LLC, Morgan Stanley Bank, N.A. and Sumitomo Mitsui Banking Corporation, as Joint Lead Arrangers, Joint Lead Bookrunners, and Co-Documentation Agents, ABN Amro Capital USA LLC, The Bank of Nova Scotia, The Bank of Tokyo-Mitsubishi UFJ, LTD. and Société Générale, as Joint Lead Arrangers, Joint Lead Bookrunners, and Co-Syndication Agents, Industrial and Commercial Bank of China Limited, New York Branch and Lloyds Bank PLC, as Mandated Lead Arrangers, and Landesbank Baden-Württemberg, New York Branch, as Manager (Incorporated by reference to Exhibit 10.1 to the Cheniere Energy Partners, L.P.’s Current Report on Form 8-K (SEC File No. 001-33366), filed on September 11, 2015) | |
10.4ƒ | Change orders to the Fixed Price Separated Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Stage 1 Liquefaction Facility, dated as of December 6, 2013, between Corpus Christi Liquefaction, LLC and Bechtel Oil, Gas and Chemicals, Inc.: (1) the Change Order CO-00005 Revised Buildings to Include Jetty and Geo-Tech Impact to Buildings, dated June 4, 2015, (2) the Change Order CO-00006 Marine and Dredging Execution Change, dated June 16, 2015, (3) the Change Order CO-00007 Temporary Laydown Areas, AEP Substation Relocation, Power Monitoring System for Substation, Bollards for Power Line Poles, Multiplex Interface for AEP Hecker Station, dated June 30, 2015, (4) the Change Order CO-00008 West Jetty Shroud and Fencing, Temporary Strainers on Loading Arms, Breasting and Mooring Analysis, Addition of Crossbar from Platform at Ethylene Bullets to Platform for PSV Deck, Reduction of Vapor Fence at Bed 22, Relocation of Gangway Tower, Changes in Dolphin Size, dated July 28, 2015, (5) the Change Order CO-00009 Post FEED Studies, dated July 1, 2015, (6) the Change Order CO-00010 Additional Post FEED Studies, Feed Gas ESD Valve Bypass, Flow Meter on Bog Line, Additional Simulations, FERC #43, dated July 1, 2015, (7) the Change Order CO-00011 Credit to EPC Contract Value for TSA Work, dated July 7, 2015, and (8) the Change Order CO-00012 Reduction of Provisional Sum for Operating Spares, Liquid Condensate Tie-In, Automatic Shut-Off Valve in Condensate Truck Fill Line, Firewater Monitor and Hydrant Coverage Test, dated August 11, 2015 (Portions of this exhibit have been omitted and filed separately with the SEC pursuant to a request for confidential treatment) | |
10.5Ġ+ | Cheniere Energy, Inc. Retirement Policy | |
10.6† | Cheniere Energy, Inc. 2015 Employee Inducement Incentive Plan (Incorporated by reference to Exhibit 4.8 to the Company’s Registration Statement on Form S-8 (SEC File No. 333-207651), filed on October 29, 2015) | |
10.7Ġ | Form of Cheniere Energy, Inc. 2015 Employee Inducement Incentive Plan Restricted Stock Grant - US Form | |
10.8Ġ | Form of Cheniere Energy, Inc. 2015 Employee Inducement Incentive Plan Restricted Stock Grant - UK Form | |
10.9ƒ | Amendment No. 1 of LNG Sale and Purchase Agreement (FOB), dated July 23, 2015, between Endesa S.A. (Buyer) and Corpus Christi Liquefaction, LLC (Seller) | |
10.10ƒ | Amendment No. 2 of LNG Sale and Purchase Agreement (FOB), dated July 23, 2015, between Endesa S.A. (Buyer) and Corpus Christi Liquefaction, LLC (Seller) | |
10.11ƒ | Amendment No. 1 of LNG Sale and Purchase Agreement (FOB), dated July 24, 2015, between Woodside Energy Trading Singapore PTE Ltd (Buyer) and Corpus Christi Liquefaction, LLC (Seller) | |
10.12ƒ | Amendment No. 2 of LNG Sale and Purchase Agreement, dated July 15, 2015, between Électricité de France, S.A. and Corpus Christi Liquefaction, LLC (Seller) |
Exhibit No. | Description | |
10.13 | Amendment No. 1 of LNG Sale and Purchase Agreement (FOB), dated August 28, 2015, between Sabine Pass Liquefaction, LLC (Seller) and Total Gas & Power North America, Inc. (Buyer) (Incorporated by reference to Exhibit 10.4 to Cheniere Energy Partner, L.P.’s Quarterly Report on Form 10-Q (SEC File No. 001-33366), filed on October 30, 2015) | |
10.14 | Amendment No. 1 of LNG Sale and Purchase Agreement (FOB), dated September 11, 2015, between Sabine Pass Liquefaction, LLC (Seller) and Centrica plc (Buyer) (Incorporated by reference to Exhibit 10.5 to Cheniere Energy Partner, L.P.’s Quarterly Report on Form 10-Q (SEC File No. 001-33366), filed on October 30, 2015) | |
10.15 | Nomination and Standstill Agreement, dated August 21, 2015, by and between Cheniere Energy, Inc., Icahn Partners Master Fund LP, Icahn Partners LP, Icahn Onshore LP, Icahn Offshore LP, Icahn Capital LP, IPH GP LLC, Icahn Enterprises Holdings LP, Icahn Enterprises G.P. Inc., Beckton Corp., High River Limited Partnership, Hopper Investments LLC, Barberry Corp., Carl C. Icahn, Jonathan Christodoro and Samuel Merksamer (Incorporated by reference to Exhibit 99.1 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on August 24, 2015) | |
10.16 | Omnibus Amendment, dated as of September 24, 2015, to the Second Amended and Restated Common Terms Agreement among Sabine Pass Liquefaction, LLC, as Borrower, the representatives and agents from time to time parties thereto, and Société Générale, as the Common Security Trustee and Intercreditor Agent (Incorporated by reference to Exhibit 10.6 to Cheniere Energy Partner, L.P.’s Quarterly Report on Form 10-Q (SEC File No. 001-33366), filed on October 30, 2015) | |
31.1* | Certification by Chief Executive Officer required by Rule 13a-14(a) and 15d-14(a) under the Exchange Act | |
31.2* | Certification by Chief Financial Officer required by Rule 13a-14(a) and 15d-14(a) under the Exchange Act | |
32.1ƒƒ | Certification by Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 | |
32.2ƒƒ | Certification of Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 | |
101.INSƒ | XBRL Instance Document | |
101.SCHƒ | XBRL Taxonomy Extension Schema Document | |
101.CALƒ | XBRL Taxonomy Extension Calculation Linkbase Document | |
101.DEFƒ | XBRL Taxonomy Extension Definition Linkbase Document | |
101.LABƒ | XBRL Taxonomy Extension Labels Linkbase Document | |
101.PREƒ | XBRL Taxonomy Extension Presentation Linkbase Document |
* | Filed herewith. |
ƒ | Filed with Original Filing. |
ƒƒ | Furnished with Original Filing. |
† | Management contract or compensatory plan or arrangement. |
+ | This exhibit corrects the exhibit previously filed as Exhibit 10.1 to the Company’s Current Report on Form 8-K, filed on June 17, 2015. |